Maintenance Preventive Maintenance MTC 2 2 MTC 2 10/2010 US Edition 32 2.6 Weekly maintenance work 2 1 2

Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
31
2
For the cleaning to be performed every day you will need the following equipment: 2
– Waste bin
– Vacuum cleaner
2
2
: Stop the placement process of the placement machine.
: Move both towers in the refill position cassette 1 using the MTC menu.
: Open the protective cover of the placement machine.
2
2
Vacuum the feed axis 2
a Carefully vacuum the feed axes of the MTC.
There should be no loose components in the feeding area.
2
2
Pay attention to the crash light barriers in the process (see illustration on the left). 2
2
2
: Close the protective cover.
: Exit the refilling position.
: Press the Start button.
2

Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
32
2.6 Weekly maintenance work
2
1
2

Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
33
2
You will need the following consumables for the weekly maintenance: 2
– Lint-free cloths
– Ethyl alcohol
2
2
: Stop the placement process of the placement machine.
: Move both towers in the refill position cassette 1 using the MTC menu.
: Open the protective cover.of the placement machine.
2
2
Cleaning the rails of the feed axis 2
a Clean the WTC contact surfaces on the rails of the feed axis with a lint-free cloth moistened
with ethyl alcohol.
2
2
Pay attention to the crash light barriers in the process (see illustration on the left). 2
2
2
Cleaning of cassette guide rails 2
s Clean the cassette guide rails (in the control panel behind the safety doors of the MTC) with a
lint-free cloth moistened with ethyl alcohol.
2
2
: Close the protective cover.
: Exit the refilling position.
: Press the Start button.
2
2