Preventive Maintenance MTC 2 Maintenance 10/2010 US Edition 2 MTC 2 31 2 For the cleaning to be performe d every day you will need the following equipment: 2 – W aste bin – V acuum cleaner 2 2 : S top the placement proce…

Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
30
2.5 Daily maintenance work
2
1

Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
31
2
For the cleaning to be performed every day you will need the following equipment: 2
– Waste bin
– Vacuum cleaner
2
2
: Stop the placement process of the placement machine.
: Move both towers in the refill position cassette 1 using the MTC menu.
: Open the protective cover of the placement machine.
2
2
Vacuum the feed axis 2
a Carefully vacuum the feed axes of the MTC.
There should be no loose components in the feeding area.
2
2
Pay attention to the crash light barriers in the process (see illustration on the left). 2
2
2
: Close the protective cover.
: Exit the refilling position.
: Press the Start button.
2

Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
32
2.6 Weekly maintenance work
2
1
2