00192324-0302_MM_MTC1-MTC2_EN.pdf - 第28页
Maintenance Preventive Maintenance MTC 2 2 MTC 2 10/2010 US Edition 28 2.4 Overview of the modules 2 Abb. 2 - 2 Overview of the modules (T ower 1) Legend 2 a Lifting axis h Electronics boar d s Feed axis j Masterdrive s …

Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
27
2.3 Maintenance plan
2
2
Interval
Position
Tools and equipment/
Consumables
Perform
ed on
Day vacuum the feed axis
Waste bin
Vacuum cleaner
Week
Clean the rails of the feed axis lint-free cloths, ethanol
Clean the cassette guide rails lint-free cloths, ethanol
2 Month Check the cassettes
Check the WTCs
Year
Oiling the drivers WD40
Inspection of the modules
All work must be carried out
by appropriately trained and
qualified personnel.
Inspection of the toothed belt
Grease the linear guides / spindle nut of the
lifting axis
2 Years Change the battery of the controller boards

Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
28
2.4 Overview of the modules
2
Abb. 2 - 2 Overview of the modules (Tower 1)
Legend
2
a Lifting axis h Electronics board
s Feed axis j Masterdrives
d Unlock device WTC 2
f Disengaging mechanism 2
g Driver (service cap)
1
2
3
4
6
5
7
Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
29
2
2
2
2
2
2
2
2
2
2
2