2.1.2 Basic rules during maintenance work
CAUTION NEVER use compressed air to clean inside the placement machine’s
modules. 2
Enter the maintenance work performed in the maintenance plan. We recommend that you adhere
to the order in which maintenance work is performed. 2
To save time while cleaning, perform the maintenance work on the SIPLACE at the same time as
the cleaning, complying with the safety instructions in the process. 2
2
2
2
2
2
Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
26
2.2 Everything needed for maintenance
The following list of materials contains all the tools, equipment and materials required for main-
taining the MTC. 2
Always use ethyl alcohol for cleaning – do not use solvents. 2
Apply all lubricants sparingly and exactly where they are needed. 2
2.2.1 Tools and equipment
Have the following tools and equipment to hand before you start the maintenance:
2.2.2 Materials
Have the following consumables to hand before you start the maintenance:
2
2
2
2
2
2
2
2
2
Tools and Equipment From item number
Waste bin
Vacuum cleaner
2
Consumable materials From item number
Lint-free cloths
Ethyl alcohol
WD40, 400 ml 00325833-01
Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
27
2.3 Maintenance plan
2
2
Interval
Position
Tools and equipment/
Consumables
Perform
ed on
Day vacuum the feed axis
Waste bin
Vacuum cleaner
Week
Clean the rails of the feed axis lint-free cloths, ethanol
Clean the cassette guide rails lint-free cloths, ethanol
2 Month Check the cassettes
Check the WTCs
Year
Oiling the drivers WD40
Inspection of the modules
All work must be carried out
by appropriately trained and
qualified personnel.
Inspection of the toothed belt
Grease the linear guides / spindle nut of the
lifting axis
2 Years Change the battery of the controller boards