YSI_Prog_E.pdf - 第25页

xxiii Safety instructions 3.4 Label positions W arning/caution labels are attached to the Y AMAHA products to ensure safe and correct use. Check that the information on each label is clearly legible and comply with the i…

100%1 / 226
xxii
Safety instructions
Potential
hazard
Could cause machine damage (collisions with head, etc.).
To avoid
hazard
Verify that no objects have been placed on the batch change carrier's (for YSM40) top cover.
Applicable
machines
Batch change carrier (YSM40)
Case
Setup
Potential
hazard
The top tape could make contact with the head, possibly causing machine damage.
To avoid
hazard
When a feeder is extracted from its loaded position, be sure that the feeder has been completely
extracted before pressing it back into its loaded position.
Applicable
machines
YSM40
Case
Setup
Potential
hazard
Pallet may drop if setting up parts on the parts supply station.
To avoid
hazard
Remove pallets before setting up parts.
Applicable
machines
C-ATS (YSM40)
Case
Setup
xxiii
Safety instructions
3.4 Label positions
Warning/caution labels are attached to the YAMAHA products to ensure safe and correct use. Check that the
information on each label is clearly legible and comply with the instructions.
For safety precautions other than those on the labels shown in this section, see the instructions in "1. Safety".
n
NOTE
When connecting power to this equipment, refer to "Power connection terminals" described in the appendix of the
operator's manual.
n
NOTE
The label contents and positions are slightly differ depending on machine model. For the label contents and positions,
refer to the operator's manual for the machine being used.
General Contents
Before using the machine
1. Using this manual i
1.1 Available manuals i
  i
2. Warranty ii
3. Contents of each chapter iii
4. Page layout iv
Chapter 1 Basic operation
  1
  1
  2
1.3 Setup screen 1-3
  4
1.4.1 "Board" screen 1-4
1.4.2 "Fiducial" screen 1-5
1.4.3 "Bad Mark" screen 1-6
1.4.4 "View" screen 1-7
1.4.5 "Step" screen 1-8
1.4.6 "Height Correct" screen (YSi-X) 1-11
1.4.7 "Code Scan" screen 1-12
1.5 Auto inspection screen 1-13
1.5.1 "Inspection" screen 1-13
1.5.2 "Whole" screen 1-14
1.5.3 "Output" screen 1-15
1.5.4 "Bad Mark" screen 1-16
1.5.5 "Judge" screen 1-16
1.5.6 "Height Measure" screen 1-17
1.5.7 "Conveyor" screen 1-18
1.5.8 "Carry Log" screen 1-19
  0
1.6.1 "Conveyor" screen 1-20
1.6.2 "I/O" screen 1-22
1.7 History 1-24
1.8  5
2. Starting and ending inspection 1-26
2.1 Starting automatic inspection 1-26
2.1.1 Selecting inspection programs 1-26
2.1.2 Starting automatic inspection 1-27
  8
2.2.1 Selecting inspection programs 1-28
EPP
6
1
38
100