00197975-06_UM_TX-Serie_EN.pdf - 第222页

4 Setting up and commissioning Us er manual SIPLACE TX-Series 4.7 Commissioning the placement m achine From software version 713.0 E dition 01/2020 222

100%1 / 346
User manual SIPLACE TX-Series 4 Setting up and commissioning
From software version 713.0 Edition 01/2020 4.7 Commissioning the placement machine
221
4.7.4 A test run or starting production
Test the line using the test PCB or a PCB provided by the customer.
Record the customer product and performance data, prepare the data and document the data
in the installation report.
Secure the data and give the customer security copies.
4 Setting up and commissioning User manual SIPLACE TX-Series
4.7 Commissioning the placement machine From software version 713.0 Edition 01/2020
222
User manual SIPLACE TX-Series 5 Tasks at the placement machine
From software version 713.0 Edition 01/2020 5.1 Staff profiles
223
5 Tasks at the placement machine
This chapter contains a number of subjects that are intended to help you during your daily work
on a SIPLACE line. For example, you are provided with preventative measures that you can take
to minimize the downtime on the placement machine to obtain the highest possible level of effi-
ciency for the SIPLACE line during production.
5.1 Staff profiles
5
Certain functions or menus may only be executed or can only accessed by specially trained per-
sonnel. A differentiation is made between the following operator levels:
Production
Advanced production
Service (customer)
The operator levels "Advanced production" and "Service (customer)" can be password protected.
PLEASE NOTE
Proper usage by qualified personnel
Incorrect usage poses a risk to life and limb and a risk of damage to equipment.
Only appropriately qualified personnel may put the placement machine into opera-
tion, operate it or perform work to the placement machine. You will find further infor-
mation
about this in section 1.5.4
, page 32.
Evidence of these qualifications must be obtained in training or instructions of per-
sonnel. These instructions must be given by personnel trained and authorized by SI-
PLACE. For an overview of the training courses, refer to section 1.6
, page 34.