00197182-04_AI_Prepare_Kit_SX12_de_en.pdf - 第58页
3 Fitting the Prepare Kit 3.2 Preparing the Trailing Cable Interface Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 Prepare Kit 04/2017 58 3.2 Preparing the Trailing Cable Interface Parts, equipment and tools ●…

Assembly Instructions / Montageanleitung SIPLACE SX1/SX2
Prepare Kit 04/2017
3 Fitting the Prepare Kit
3.1 Preparations at the Machine
57
3 Fitting the Prepare Kit
3.1 Preparations at the Machine
► Switch off the machine, disconnect it from the power supply and secure it to prevent
unauthorized reactivation. Observe the instructions in section 1.2 "Preparatory Work..." [}48].
► Remove the changeover table from location 2.
Fig.6: Removing the covers
1. Side cover
2. Trailing cable cover
3. Cover on infrastructure box
► Remove the side cover(1) and the trailing cable
cover(2) from the left side of the location.
► Remove the inner cover on the infrastructure box
(3).

3 Fitting the Prepare Kit
3.2 Preparing the Trailing Cable Interface
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2
Prepare Kit 04/2017
58
3.2 Preparing the Trailing Cable Interface
Parts, equipment and tools
●
Support for trailing cable interface [03068747-xx]
●
Vision hotlink adapter [03050555-xx]
●
Trailing cable interface [03064127-xx]
●
2x ground cable 0.5 m [03055213-xx] from cable set for gantry 2 [03052290-xx]
●
C-parts trailing cable interface support [03094645-xx]
– 10x socket-head screws M3x6 [03042541-xx]
– 2x lens head screws M4x6 [03046903-xx]
– 1x socket-head screws M5x8 [03042559-xx]
– 1x serrated lock washer 5-FSt [03047704-xx]
Installation
The support for the trailing cable interface and the hotlink adapter should be prepared with the
spacer bolts at the top and bottom and with a ground screw.
► First fit the trailing cable interface support with the hotlink adapter, by fixing it from below to
the bracket (4x M3x6 mm socket-head screws).
► Now fit the trailing cable interface from above, onto the support.
(6x M3x6 mm socket-head screws)
Fig.7: Trailing cable interface
1. Jumper for trailing cable interface
2. Ground screw for trailing cable interface
► Fix the ground cable 0.5 m to the support, using
the existing ground screw.
► Fix the ground cable 0.5 m directly to the trailing
cable interface, using the socket-head screw
M5x8 mm and the serrated lock washer 5-FSt.
► Set the jumper as shown in the image.
Fig.8: Trailing cable interface with support
1. Trailing cable interface support
2. Hotlink adapter
3. Trailing cable interface
4. Ground screw for trailing cable interface support
► Attach the pre-fitted trailing cable interface sup-
port, by screwing it with the lens head screws
(M4x6 mm) into the relevant pre-drilled holes
above the infrastructure box.
► Both ground cables are attached to the earthing
panel on the machine. (spare screws and contact
discs can be found on the earthing panel)

Assembly Instructions / Montageanleitung SIPLACE SX1/SX2
Prepare Kit 04/2017
3 Fitting the Prepare Kit
3.3 Preparing and Fitting the GCU
59
3.3 Preparing and Fitting the GCU
Parts, equipment and tools
●
GCU carrier [03065813-xx]
– 2x hexagonal nuts M4 [03008166-xx]
– Ground M5 [03050528-xx]
– 3x socket-head screw M4x8 mm [03042551-xx]
●
Bracket assembly [03066100-xx]
●
Positioning control unit for gantry axes GCU [03052200-xx]
●
C-parts GCU carrier [03094644-xx]
– 2x hexagonal nuts M4 [03008166-xx]
– 5x socket-head screw M4x8 mm [03042551-xx]
– 2x serrated lock washer 4-FSt [03047857-xx]
– 1x contact disc 4 FSt [03047654-xx]
– 5x washers 4.3mm [00316894-xx]
Installation
► Check the jumper setting on the GCU. This must be as follows for the GCU 3:
Jumper Position
1 Left (OFF)
2 Right (ON)
3 Right (ON)
4 Left (OFF)
See also:
●
4.1.1 "GCU (Up To Machine No. Mxxxx)" [}73]
●
4.1.2 "MGCU (From Machine No. Nxxxx to Oxxxx)" [}74]
●
4.1.3 "MGCU - Full Mode (From Machine No. Pxxxx)" [}75]
Fig.9: Carrier
1. Pre-drilled hole for threaded pin on GCU
2. Bracket for GCU 1/3, rear position
3. Bracket for GCU 1, front position
(not used for location 2)
4. Ground connection GCU carrier