00197182-04_AI_Prepare_Kit_SX12_de_en.pdf - 第58页

3 Fitting the Prepare Kit 3.2 Preparing the Trailing Cable Interface Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 Prepare Kit 04/2017 58 3.2 Preparing the Trailing Cable Interface Parts, equipment and tools ●…

100%1 / 80
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2
Prepare Kit 04/2017
3 Fitting the Prepare Kit
3.1 Preparations at the Machine
57
3 Fitting the Prepare Kit
3.1 Preparations at the Machine
Switch off the machine, disconnect it from the power supply and secure it to prevent
unauthorized reactivation. Observe the instructions in section 1.2 "Preparatory Work..." [}48].
Remove the changeover table from location 2.
Fig.6: Removing the covers
1. Side cover
2. Trailing cable cover
3. Cover on infrastructure box
Remove the side cover(1) and the trailing cable
cover(2) from the left side of the location.
Remove the inner cover on the infrastructure box
(3).
3 Fitting the Prepare Kit
3.2 Preparing the Trailing Cable Interface
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2
Prepare Kit 04/2017
58
3.2 Preparing the Trailing Cable Interface
Parts, equipment and tools
Support for trailing cable interface [03068747-xx]
Vision hotlink adapter [03050555-xx]
Trailing cable interface [03064127-xx]
2x ground cable 0.5 m [03055213-xx] from cable set for gantry 2 [03052290-xx]
C-parts trailing cable interface support [03094645-xx]
10x socket-head screws M3x6 [03042541-xx]
2x lens head screws M4x6 [03046903-xx]
1x socket-head screws M5x8 [03042559-xx]
1x serrated lock washer 5-FSt [03047704-xx]
Installation
The support for the trailing cable interface and the hotlink adapter should be prepared with the
spacer bolts at the top and bottom and with a ground screw.
First fit the trailing cable interface support with the hotlink adapter, by fixing it from below to
the bracket (4x M3x6 mm socket-head screws).
Now fit the trailing cable interface from above, onto the support.
(6x M3x6 mm socket-head screws)
Fig.7: Trailing cable interface
1. Jumper for trailing cable interface
2. Ground screw for trailing cable interface
Fix the ground cable 0.5 m to the support, using
the existing ground screw.
Fix the ground cable 0.5 m directly to the trailing
cable interface, using the socket-head screw
M5x8 mm and the serrated lock washer 5-FSt.
Set the jumper as shown in the image.
Fig.8: Trailing cable interface with support
1. Trailing cable interface support
2. Hotlink adapter
3. Trailing cable interface
4. Ground screw for trailing cable interface support
Attach the pre-fitted trailing cable interface sup-
port, by screwing it with the lens head screws
(M4x6 mm) into the relevant pre-drilled holes
above the infrastructure box.
Both ground cables are attached to the earthing
panel on the machine. (spare screws and contact
discs can be found on the earthing panel)
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2
Prepare Kit 04/2017
3 Fitting the Prepare Kit
3.3 Preparing and Fitting the GCU
59
3.3 Preparing and Fitting the GCU
Parts, equipment and tools
GCU carrier [03065813-xx]
2x hexagonal nuts M4 [03008166-xx]
Ground M5 [03050528-xx]
3x socket-head screw M4x8 mm [03042551-xx]
Bracket assembly [03066100-xx]
Positioning control unit for gantry axes GCU [03052200-xx]
C-parts GCU carrier [03094644-xx]
2x hexagonal nuts M4 [03008166-xx]
5x socket-head screw M4x8 mm [03042551-xx]
2x serrated lock washer 4-FSt [03047857-xx]
1x contact disc 4 FSt [03047654-xx]
5x washers 4.3mm [00316894-xx]
Installation
Check the jumper setting on the GCU. This must be as follows for the GCU 3:
Jumper Position
1 Left (OFF)
2 Right (ON)
3 Right (ON)
4 Left (OFF)
See also:
4.1.1 "GCU (Up To Machine No. Mxxxx)" [}73]
4.1.2 "MGCU (From Machine No. Nxxxx to Oxxxx)" [}74]
4.1.3 "MGCU - Full Mode (From Machine No. Pxxxx)" [}75]
Fig.9: Carrier
1. Pre-drilled hole for threaded pin on GCU
2. Bracket for GCU 1/3, rear position
3. Bracket for GCU 1, front position
(not used for location 2)
4. Ground connection GCU carrier