00196626-06_AI_Portalmodularitaet_SX12_de_en.pdf - 第105页

Fitting the Gantry Performing Calibration Final Work Gantry Modularity Portalmodular ität 105 Calibration ► SR 704.xx ► User => Service ► Machine Service => Machine Configuration ► Confirm and Change Configuration …

100%1 / 120
Fitting the Gantry
Final Work Performing Calibration
104 Gantry Modularity Portalmodularität
3.6.6 Performing Calibration
Overview
The SW704 divides the mapping data and then merges them during the gantry upgrade. In most cases
this means that only a brief calibration procedure needs to be performed (see Fast Hardware Exchange
and flow diagram).
If gantry 1 is fitted, you need to perform PCB/component mapping with the glass plate, irrespective of
the head configuration (gantry 1 is the master gantry).
NOTICE
TH gantry at location 2
If there is a TH gantry at location 2 (gantry 2), the PCB mapping data must be present. Com-
ponent mapping can then be performed using the aluminum plate.
NOTICE
Long Board Option
If a gantry is installed on a machine with Long Board Option (LBO), this gantry has to be
mapped with the mapping with LBO button.
Fitting the Gantry
Performing Calibration Final Work
Gantry Modularity Portalmodularität 105
Calibration
SR 704.xx
User => Service
Machine Service => Machine Configuration
Confirm and Change Configuration => confirm
Fitting the Gantry
Final Work Performing Calibration
106 Gantry Modularity Portalmodularität
3.6.6.1 Description and Connections on the GCU
GCU - front side
GCU - rear side