4OM-1322-006_w.pdf - 第86页

1-27 AKOEMT -ID 3.3.6 PCB Chuck Section Upper Surface of PCB T ransfer Belt Every Day Cleaning Remove solder paste and dust with a vacuum cleaner . PCB Positioning Side and Upper Surface Every Day Cleaning Remove solder …

100%1 / 211
1-26 AKOEMT-ID
R Conveyor
Note
Upper Surface of PCB Transfer
Belt
Every Day Cleaning
Remove solder paste and dust
with a vacuum cleaner.
Guide Bushing for Conveyor
Width Change
Trapezoid Screw for Conveyor
Width Change
Spline Axis for Conveyor Width
Change
Every Month Cleaning
Clean the stopper with an oiled
rag.
Do not leave any waste
threads after cleaning.
Guide Bushing for Conveyor
Width Change
Trapezoid Screw for Conveyor
Width Change
Spline Axis for Conveyor Width
Change
Every 6 Months Lubrication
Apply grease with a brush or a
spatula.
Fig. 4A20
0609-002
3.3 Inspection, Cleaning, and Lubrication Spots
1-27 AKOEMT-ID
3.3.6 PCB Chuck Section
Upper Surface of PCB Transfer
Belt
Every Day Cleaning
Remove solder paste and dust
with a vacuum cleaner.
PCB Positioning Side and
Upper Surface
Every Day Cleaning
Remove solder paste and dust with
a vacuum cleaner.
Upper Surface and Pin Hole
Section of Backup Table
Every Week Cleaning
Remove solder paste and dust
with a vacuum cleaner
.
Fig. 4A21
Note
Backup Table Z-Axis Guide
Bushing
Every Month Cleaning
Clean the stopper with an oiled
rag.
Do not leave any waste
threads after cleaning.
Fig. 4A22
0609-002
3.3 Inspection, Cleaning, and Lubrication Spots
1-28 AKOEMT-ID
Backup Table Z-Axis Guide
Bushing
Every 6 Months Lubrication
(1) Move up the backup table
Z axis.
(2) Apply grease with a brush
or a spatula.
Backup Table Z-Axis Ball Screw
Every 6 Months Lubrication
(1) Move up the backup table
Z axis.
(2) Apply grease with a brush
or a spatula.
Fig. 4A23
Torapezoid Screw for Chute Width
Change
(Left Side), (Right Side)
Every 6 Months Lubrication
(1) Move up the backup table
Z axis.
(2) Apply grease with a brush
or a spatula.
Fig. 4A24
0609-002
3.3 Inspection, Cleaning, and Lubrication Spots