00198519-03_UM_LDU_2_X_DE_EN_CHS-ZH.pdf - 第107页

107 User Manual / Bedienungsanleitung / 用户手册 SIPLACE Linear Dipping Unit 2 X 05/2020 Contents Contents 1 Introduction .. 111 1.1 Module Description .. 111 1.1.1 EU Declaration of Conformity .. 111 1.1.2 Correct Usa…

100%1 / 310
5 Reinigung
5.4 Gereinigte Teile einsetzen
106 User Manual / Bedienungsanleitung / 用户手册 SIPLACE Linear Dipping Unit 2 X 05/2020
107User Manual / Bedienungsanleitung / 用户手册 SIPLACE Linear Dipping Unit 2 X 05/2020
Contents
Contents
1 Introduction.. 111
1.1 Module Description.. 111
1.1.1 EU Declaration of Conformity.. 111
1.1.2 Correct Usage.. 111
1.1.3 Incorrect Usage.. 111
1.1.4 Requirements and restrictions.. 112
1.1.5 Technical data.. 112
1.1.6 Environmentally-friendly disposal of materials and components.. 112
1.1.7 Electromagnetic compatibility (EMC).. 113
1.1.8 Use of original SIPLACE accessories and spare parts.. 113
1.2 Important notes on this user manual.. 113
1.2.1 Contents and filing of this user manual.. 113
1.2.2 Danger notes.. 113
1.2.3 Manufacturer's/Supplier's liability.. 113
1.2.4 Release history.. 113
1.2.5 Further information.. 114
1.2.5.1 How to get information.. 114
1.2.5.2 SIPLACE on the World Wide Web (WWW).. 114
2 Operational safety.. 115
2.1 Safety instructions.. 115
2.1.1 Conventions for the use of safety instructions and symbols.. 115
2.1.2 Important notes on operational safety.. 116
2.1.2.1 General information.. 116
2.1.2.2 Safety of operators and other persons.. 116
2.1.2.3 Safety of plant and equipment.. 116
2.1.3 Staff qualifications and training.. 117
2.1.4 Danger of crushing.. 117
2.1.5 Transport safety information.. 117
2.2 Warning labels.. 118
2.2.1 Warning labels on the LDU.. 118
2.2.2 Important note on warning, prohibition and cautionary labels.. 119
2.3 Safety features.. 119
2.4 ESD guidelines.. 120
2.4.1 What does ESD mean?.. 120
2.4.2 Important measures to protect against static charging.. 120
2.4.3 Handling ESD modules.. 120
2.4.4 Measurements and modifications to ESD modules.. 120
2.4.5 Dispatching ESD modules.. 121
2.5 FCC, RFID.. 121
2.5.1 FCC Caution.. 121
2.5.2 RFID on the LDU 2 X.. 121
2.5.3 FCC label on the LDU 2 X.. 122
2.6 IMDA Registration.. 122
2.6.1 IMDA label on the LDU 2 X.. 122
108 User Manual / Bedienungsanleitung / 用户手册 SIPLACE Linear Dipping Unit 2 X 05/2020
Contents
3 Function description and structure.. 123
3.1 Function description.. 123
3.2 Structure.. 126
3.2.1 Housing.. 126
3.2.2 Squeegee.. 127
3.2.3 Park plate and drip tray.. 128
3.2.4 Flux Level Sensor.. 128
3.2.5 Dipping plate.. 131
3.2.6 Dip stroke plate.. 133
3.2.7 Axes.. 134
3.2.8 Leveling device.. 135
3.2.9 Electronics.. 136
3.2.10 User interface.. 137
3.3 Basic process.. 138
3.3.1 Usage of flux.. 138
3.3.2 Thickness of flux layer.. 140
3.3.3 Cicatrization time.. 142
3.3.4 Viscosity and thixotropy.. 142
3.3.5 Squeegee speed.. 143
3.3.6 Dipping process and dwell time.. 144
3.3.7 Creep distance.. 144
4 Operation.. 145
4.1 Settings in SIPLACE Pro.. 145
4.1.1 Setting up the LDU.. 146
4.1.2 Defining the dipping plate.. 147
4.1.3 Assigning a dipping plate and a flux to the LDU.. 155
4.1.4 Selecting a component for dipping.. 157
4.1.5 Assigning a flux to a component.. 157
4.1.6 Setting the Flux Level Sensor parameters.. 158
4.1.7 Setting the dipping sequence and the dwell time.. 158
4.1.8 Setting the cavity depth and the pressing force.. 159
4.1.9 Setting the creep distance.. 160
4.1.10 Setting the waiting time.. 160
4.1.11 Setting the cicatrization time of the flux.. 161
4.1.12 Setting the warm-up cycles and the squeegee speed.. 162
4.2 Performing planarity check.. 163
4.3 Setting the zero position of the dipping plate.. 165
4.4 Adjust cavity depth.. 171
4.5 Checking the layer thickness.. 174
4.5.1 Layer thickness measurement "comb".. 174
4.5.2 Layer thickness measurement "roller".. 175
4.6 Testing new flux types.. 177
4.7 Performing a self-test.. 178
4.8 Operating the control unit via user interface.. 179
4.9 Handling.. 182
4.10 Positioning the LDU and logging on.. 183
4.11 Starting a reference run.. 184
4.12 Fitting.. 185
4.13 Aligning.. 189