TP3447.Production Lot Operations_standard.pdf - 第13页

SMT Softw are En gineering Group IM Operations Y AMAHA M OTOR CO., L TD MDOC-SOFT50283 13/62 Edit the contents you want to associate with the program. Set the production lot names in the “Production Lot” field. As the pr…

100%1 / 62
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
12/62
3.1.4 Creating a new program list
This section describes how to create a new program list and register the association
between the production lot and board program name.
Select board data you want to register and start up Program List Editor in the “program
name registration startup” mode.
Program List Editor starts up with the program names registered into the program list file.
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
13/62
Edit the contents you want to associate with the program.
Set the production lot names in the “Production Lot” field.
As the production lot name is specified, the associated program can be selected.
When necessary, set the production model information in the “Production Model
(ASSY)” and “Board face” fields.
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
14/62
When necessary, set the program name for each machine in the “Program Name [1]”
to “Program Name [9]” fields in the [Program Contrast [Other Equipment]] tab window.
* The program name can be copied to Clipboard using the procedures shown below.
Select a board with Board Explorer, and then select [Copy Name (N)]-[Copy File
Name (0) ([Copy Lane 1 Board Name (1)]/[Copy Lane 2 Board Name (2)]) from the
right-click menu.
From the [File] menu, select [Save Program List].