TP3447.Production Lot Operations_standard.pdf - 第46页
SMT Softw are En gineering Group IM Operations Y AMAHA M OTOR CO., L TD MDOC-SOFT50283 46/62 5.2 “OP002: Setup V erif y” corr esponding to the pro duction lot The setup work after lo ading the program is not changed. * F…

SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
45/62
5.1.3 Cautions
It is possible to commonly use the program list file that is used for “OP003: Auto Pgm
Change Over”.
In this case, set the same settings as those of the program list file that is used for
“OP003: Auto Pgm Change Over” for the path and file name of the program list file.

SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
46/62
5.2 “OP002: Setup Verify” corresponding to the production
lot
The setup work after loading the program is not changed.
* For details about the setup work, see the “IT Option Setup Verify User’s Manual”.

SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
47/62
5.3 “OP003: Auto Pgm Change Over” corresponding to the
production lot
In the Auto Pgm Change Over function, the board program can be changed using the
production lot.
The production lot was added to the program allocation conditions.
Allocation conditions Allocation results
Production Lot Programs meeting “Production Lot”.
Production Model (ASSY) + Surface
Info + Production Lot
Programs meeting “Production Model (ASSY)”,
“Surface Info”, and “Production Lot”.
Production Model (ASSY) + Surface
Info
Programs meeting “Production Model (ASSY)” and
“Surface Info”.
* Existing operation
The data is searched for in order from the top of the program list.
When there are multiple allocation results, the program that satisfies the conditions first is
used.
* For details about the “Auto Pgm Change Over” function, see the “IT Option Auto Pgm
Change Over User’s Manual”.
5.3.1 Introduction
5.3.1.1 Preparations
When performing the production lot operation, it is necessary to change the option setting
file (OP003.ini) to the applicable version.
* When the old version is used continuously, the setting of the production lot operation
cannot be changed. In this case, the system operates with the production lot operation set at
“OFF”.
When performing the production lot operation, it is necessary to add the production lot to the
program list.
* For details about how to add the production lot to the program list, see “3. P-Tool: Program
List Editor”.
When performing the production lot operation, the production lot is added to the code format
for the “Auto Pgm Change Over” function.
* For details about how to change the code format, see the Server Utility Software User’s
Manual.