TP3447.Production Lot Operations_standard.pdf - 第37页

SMT Softw are En gineering Group IM Operations Y AMAHA M OTOR CO., L TD MDOC-SOFT50283 37/62 In the “Select prod uction lot” dialog box, select a production lot you want to produce, and then click the [OK] button. The bo…

100%1 / 62
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
36/62
5.1.2 Operation procedure
5.1.2.1 Production lot selection
To instruct the operation in units of production lots, specify a target production lot from the
program list.
Click [Setup] - [Select lot] button.
The “Board data select” dialog box will appear. Then, the “Select production lot” dialog box
automatically appears above it.
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
37/62
In the “Select production lot” dialog box, select a production lot you want to produce, and
then click the [OK] button.
The board program with the file format and location displayed in the “Board data select” dialog
box is loaded.
When changing the file format or location;
Click the [Cancel] button to close the “Select production lot” dialog box, and then change the
file format or location in the “Board data select” dialog box.
Clicking the [Select lot] button in the “Board data select” dialog box will display the Select
production lot” dialog box again.
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
38/62
For the dual lane (TYPE-1/TYPE-2), the board program is loaded to the lane that is selected
by clicking the “lane selection” button in the “Board data select” dialog box.
Button state Contents
Lane 1 Board program is loaded to the lane 1.
Lane 2 Board program is loaded to the lane 2.
Lane Combine Combined board (CYGX) with the file name that matches to
the program name of the program list is loaded.