TP3447.Production Lot Operations_standard.pdf - 第17页

SMT Softw are En gineering Group IM Operations Y AMAHA M OTOR CO., L TD MDOC-SOFT50283 17/62 3.1.6 C hecking the program list Y ou can check if the d a ta that has been added to the program list is applicable to the prod…

100%1 / 62
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
16/62
The confirmation message will appear. Click the [OK] button.
The selected lines are then deleted.
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
17/62
3.1.6 Checking the program list
You can check if the data that has been added to the program list is applicable to the
production lot operation.
Select [Edit (E)] – [Production Lot Operation Check (P)].
In the “Ea25887: Production lot operation check execution” message window, click the
[OK] button.
The production lot operation check is executed, and then the check result is displayed.
When all of the data are correct, the “Ea25888: Production lot operation check completion”
message window will appear.
SMT Software Engineering Group
IM Operations YAMAHA MOTOR CO., LTD
MDOC-SOFT50283
18/62
If there is any data that is not suitable for the production lot operation, the “Ea25889:
Production lot operation check error” message window will appear.
The background of the data that is not suitable for the production lot operation is displayed in
yellow or red.
Background color Contents
Yellow Data that can allocate the board program, but is not suitable for the
production lot operation.
Data without entering the production lot
Data with duplicate board program allocation conditions
Red Data that cannot allocate the board program.
* Even when the data is edited to its correct state after checking, the background color does
not change at real-time. When the check is needed, run [Production Lot Operation Check]
again.
* The background color is reset at the program list save or load timing.