PRINTER PREPARATION PRE POWER UP CHE CKS 4.72 Installation Manual Chapter Issue 15, May 20 External Services T ype 1, 2, 3 and 5 printers In order for the printer to fu nction correctly the following services must be ava…

PRINTER PREPARATION
PRE POWER UP CHECKS
Chapter Issue 15, May 20 Installation Manual 4.71
Ensure that the voltage selector switch, on the front panel of the onboard
vacuum filtration unit, is set to match the supply voltage. To check or switch the
voltage selector, carry out the following:
1. Using a 10mm spanner, remove the voltage selector control knob from the
fan housing.
2. Fit the voltage selector control knob to the voltage selector switch.
NOTE
The spindle has three keyways allowing the knob to be fitted in one position
only.
3. Ensure that the pointer of the knob is indicating the voltage that closely
matches the mains supply voltage.
NOTE
a. 1. This unit is liable to damage if the voltage selector does not match the
supply voltage.
b. 2. The ‘0’ position on the voltage selector is OFF disabling the vacuum
filtration unit.
4. Return the voltage selector control knob to the fan housing to prevent further
adjustment.
Voltage Selector Switch
Voltage
Selector
Control Knob
115v

PRINTER PREPARATION
PRE POWER UP CHECKS
4.72 Installation Manual Chapter Issue 15, May 20
External Services
Type 1, 2, 3 and 5 printers
In order for the printer to function correctly the following services must be
available:
• Pneumatic Supply
• Electrical Supply
Other services that may be required are:
• Host Communications
• Upline/Downline Machine Interface (FMI/MIU)
• Temperature Control Module (TCM)
Item Description Item Description
1 Printer Mains Supply Cable 4 Foreign Machine Interface (FMI) Pod
2 Temperature Control Module (TCM) 5 Air Connection
3 Host Comms LAN RJ45 6 Multi Interface Unit (MIU)
M
1
S
K
1
M
1
S
K
1
U
PL
I
N
E
UP
LI
NE
M1
SK
2
M1
SK
2
D
O
W
N
LI
NE
D
O
W
NLI
N
E
M
1P
L3
M1PL3
D
E
K
M
/
C
DEK
M
/C
M
1
S
K
4
M
1S
K
4
D
E
K
U
SB
DEK
U
S
B
+1
2
V+
1
2
V
+2
4
V
+24
V
+2
4V SW
+24
V
SW
S
E
N
D
U
P
L
I
NE
S
END UP
LI
N
E
S
E
N
D
DOW
N
LINE
S
E
N
D
DO
WN
L
IN
E
CO
NTRO
L
I
N
CO
N
T
R
OLI
N
UP
L
I
N
E
R
E
AD
YUP
L
I
NE REA
D
Y
DO
W
N
LI
N
E
R
EAD
Y
DO
W
N
L
INE R
E
A
D
Y
C
ONTRO
L
OUT
C
O
NTR
OL
OU
T
P
O
WE
R
P
OWER
I
/P'
SI
/P'
S
O
/P
'SO
/
P'
S
P
RO
T
OC
O
L
S
EL
EC
T
IO
N
P
R
O
TOC
OL
SE
L
E
CTIO
N
U
P
U
P
L
I
N
E
L
I
N
E
DO
WN
DOWN
LIN
E
LINE
M
IU
1
9
1
11
4
MI
U
191114
4
8
0
4
8
0
POWER ON
PART No. 160740
M/C AVAILABLE
BOARD AVAILABLE
BOARD PASS
D
O
W
N
LIN
E
BOARD AVAILABLE
BOARD PASS
M/C AVAILABLE
U
P
LIN
E
FMI POD
View on RearView on Front
1
2
3
4
5
6
M1SK1
UPLINE
M1SK2
DOWNLINE
M1PL3
DEK M/C
M1SK4
DEK USB
+12V
+24V
+24V SW
SEND UPLINE
SEND DOWNLINE
CONTROL IN
UPLINE READY
DOWNLINE READY
CONTROL OUT
POWER
I/P'S
O/P'S
PROTOCOL SELECTION
UP
LINE
DOWN
LINE
MIU 191114
4
80
4
80

PRINTER PREPARATION
PRE POWER UP CHECKS
Chapter Issue 15, May 20 Installation Manual 4.73
Type 4 Printers
In order for the printer to function correctly the following services must be
available:
• Pneumatic Supply
• Electrical Supply
Other services that may be required are:
• Host Communications
• Upline/Downline Machine Interface (FMI)
• Temperature Control Module (TCM)
Item Description Item Description
1 Printer Mains Supply Cable 4 Host Comms LAN RJ45
2 Air Connection 5 Foreign Machine Interface (FMI) Pod
3 Temperature Control Module (TCM)