1OM-1003-007.pdf - 第122页

1.3 Start of Automatic Operation Operation Procedure (1) Confirm that the front safety door is closed. (2) Set the [OPERA TION] switch on the front operation panel to the "RUN" side and be sure to remove the se…

100%1 / 151
Refer to "Attachment and Detachment of Tape Feeders onto
Feeder Carriage" in the instruction manual of tape feeders for
details.
(3) After the tape feeder has been attached, close the feeder work
area safety doors.
Press the [FEEDER READY] buttons and check that the lamps
of these buttons are ON.
Preparation for P.C.B.’s
In the case of normal automatic operation, confirm that P.C.B.’s are
prepared in the input machine.
When this machine is operated singly (actual placement test,
etc.), follow the steps below.
(1) Set the [OPERATION] switch to the "SETUP" side and open the
front safety door.
Fig. 1C16
(2) Set a P.C.B. on the L conveyor (input conveyor) such that the
P.C.B. detection sensor is turned on (the red LED of the sensor
illuminates).
Fig. 1C17 P.C.B. Flow Direction: From Left to Right
POWER ON
STOP
START
ENABLE
RUN SETUP
OPERATION
LOCK
PNL CHANGE
L Conveyor
(Input Conveyor) (P.C.B. Positioning Section)
R Conveyor
(Output Conveyor)
L Conveyor P.C.B. Detection L Sensor
P.C.B. Flow Direction
P.C.B.
1.2 Preparation before Automatic Operation
0305-001 3-10 AIL01EOPP
Note
1.3 Start of Automatic Operation
Operation Procedure
(1) Confirm that the front safety door is closed.
(2) Set the [OPERATION] switch on the front operation panel to the
"RUN" side and be sure to remove the selection key from the ma-
chine.
Fig. 1C18
(3) Check the surroundings of the machine and confirm safety before
starting the automatic operation.
Before starting the automatic operation, check care-
fully that there is no person or objects (tools, parts,
etc.) around the moving mechanisms of the machine
(especially, the other side of machine operation).
(4) Open the "OPN. MODE" window (submenus) on the touch screen
and press the [PLACE] button entitled "RUN MODE" in the "Run
Mode 1" tab sheet.
Fig. 1C19
1.3 Start of Automatic Operation
POWER ON
STOP
START
ENABLE
RUN SETUP
OPERATION
LOCK
PNL CHANGE
0412-004 3-11 AIL01EOPP
WARNING
(5) Press the [Origin/Signal Info.] tab in the "AUTO OPN." submenu
window. The "Origin/Signal Info." tab sheet opens. Check the origin
marks.
Fig. 1C20
(6) When the [START] button on the front operation panel is pressed
while the lamp is flickering, the automatic operation (placement)
starts.
Fig. 1C21
When the automatic operation (component placement) starts, all origin
marks disappear and the LED (green) of the [START] button on the
front operation panel and the green lamp of the light tower illuminate.
(a) The automatic operation cannot be started unless the
"AUTO OPN." window is active.
(b) When a P.C.B. already exists in the P.C.B. positioning sec-
tion, the machine discharges the P.C.B. without placing
any component on the P.C.B.
POWER ON
STOP
START
ENABLE
RUN SETUP
OPERATION
LOCK
PNL CHANGE
1.3 Start of Automatic Operation
0305-001 3-12 AIL01EOPP
Note