1OM-1003-007.pdf - 第98页

3.3 P .C.B. T ransfer (to the output machine) The P .C.B. where all required components are placed is transferred from the P .C.B. transfer section to the R conveyor and carried further to the output machine. Fig. 1A33 3…

100%1 / 151
3.2 Component Picks and Placement
Component Pick-Up
Components are picked up from the tape feeder by the vacuum
nozzles on the placement heads.
Fig. 1A31 Component Pick-Up Section (Station #12)
Component Placement
The component picked up by the vacuum nozzle is placed on the
P.C.B. in the component placement section.
Fig. 1A32 Component Placement Section (Station #6)
3.2 Component Picks and Placement
Tape Feeder
Placement Head
Component
Vacuum Nozzle
0305-001 1-34 AIL01EOPP
3.3 P.C.B. Transfer (to the output machine)
The P.C.B. where all required components are placed is transferred
from the P.C.B. transfer section to the R conveyor and carried further to
the output machine.
Fig. 1A33
3.3 P.C.B. Transfer (to the output machine)
R Conveyors
P.C.B.
Output Machine
0305-001 1-35 AIL01EOPP
0305-001 1-36 AIL01EOPP