TUT-CP842-Oper guide-preliminary.pdf.pdf - 第80页

A new panel can be loaded onto the XY -table by means of a command opera- tion. This can also be used when a panel is already on the XY -table and the new panel is to be loaded after the existing panel is unloaded. The p…

100%1 / 91
It is possible to set the sequence from which production is to start. This oper-
ation must be carried out with the panel on the XY-table.
Procedure
1. Select [Production] from the [Main] screen.
2. Then select [Start Sequence].
3. Select [Production Start Number].
4. Use the numeric keypad to input the number of the sequence
from which production is to start.
5. Press the START button.
Note: If fiducial mark acquisition has not been completed for the panel on the
XY-table, production will start from the specified sequence but after the
fiducial marks are read.
8.2 Setting the Production Start Sequence
Chapter 8: Production Support Functions
Preliminary
8-3CP-842E/842ME Operator’s Guide
A new panel can be loaded onto the XY-table by means of a command opera-
tion. This can also be used when a panel is already on the XY-table and the
new panel is to be loaded after the existing panel is unloaded. The panels can
be changed using the following operation.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Load Panel].
3.
Press the START button.
All panels from the XY-table to the out-conveyor can be unloaded. Remove
the panels in order as they are unloaded to the out-conveyor.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Unload] from the [Load/Unload] section.
3. Press the START button.
8.4 Unloading Panels From the XY-table
8.3 Loading a New Panel
Chapter 8: Production Support Functions
Preliminary
8-4 CP-842E/842ME Operator’s Guide
All panels remaining in the machine (in-conveyor, in-carrier, XY-table) can be
unloaded. Remove the panels in order as they are unloaded to the out-con-
veyor.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Flush Out] from the [Load/Unload] section.
3. Press the START button.
The position from which the XY-table receives a panel from the in-conveyor
is referred to as the "loading position" and the position from which a panel is
unloaded from the XY-table to the out-conveyor is called the "unloading posi-
tion".
Procedure
1.
Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Move to Loading Position] or [Move to Unloading
Position] from the [Main Conveyor] section.
3. Press the START button.
8.6 Moving to the Panel Loading/
Unloading Position on the XY-Table
8.5 Unloading All Panels
Chapter 8: Production Support Functions
Preliminary
8-5CP-842E/842ME Operator’s Guide