Panels can be loaded using a Step operation mode. Procedure 1. Select [Panel Loader] from the [Setup] section at the [Main] screen. 2. Select [Loader Maintenance]. 3. Select [Load Panel] from the [Step Action] section. 4…

The panel lifter for the XY-table is operated via the Z-axis servo motor. This
lifter moves up and down to receive a panel from the in-carrier and unload a
panel to the out-conveyor.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Lifter Up] or [Lifter Down] from the [Main Conveyor] sec-
tion.
3. Press the START button.
Main conveyor clampers can be operated individually.
The panel lifter can only move up and down when the XY-table is at the load-
ing or unloading position. Consequently, the XY-table must be moved to the
loading or unloading position before this command can be used (see section 8-
6).
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Clamp] or [Unclamp] from the [Main Conveyor] section.
3. Press the START button.
8.8 Main Conveyor
Clamping/Unclamping
8.7 Panel Lifter Up/Down
Chapter 8: Production Support Functions
Preliminary
8-6 CP-842E/842ME Operator’s Guide

Panels can be loaded using a Step operation mode.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Loader Maintenance].
3. Select [Load Panel] from the [Step Action] section.
4. Press the START button to load panels in a step operation for-
mat. After each step, the START button is enabled again.
5.
Press the START button repeatedly after each step until loading
is completed.
6. When loading is completed, the [Loader Maintenance] screen
displays.
8.9 Step Mode Panel Loading
Chapter 8: Production Support Functions
Preliminary
8-7CP-842E/842ME Operator’s Guide

Panels on the in-conveyor can be loaded to the in-carrier. To do this, set a
panel on the in-conveyor (Panel check sensor must be on), then perform the
procedure shown below.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Loader Maintenance].
3. Select [In-carrier Pickup] at the [Panel Transport Position] sec-
tion.
4. Press the START button.
A panel on the in-carrier can be loaded to the main conveyor using the proce-
dure shown below.
Procedure
1. Select [Panel Loader] from the [Setup] section at the [Main]
screen.
2. Select [Loader Maintenance].
3. Select [Main Conveyor Pickup] at the [Panel Transport Position]
section.
4. Press the START button.
8.11 Loading Panels to the Main
Conveyor
8.10 Loading Panels to In-Carrier
Chapter 8: Production Support Functions
Preliminary
8-8 CP-842E/842ME Operator’s Guide