_414214_AVK3 服务手册.pdf - 第26页

2.1 Installation Procedure SERVICE MANUAL A VK3 2.1−1 D77SEC−1 1−040−A0 2.1 Installation Procedure D77SEC−1 1−040−A0 Sentence No. 2.1.1 Installation Position Installation position 1. Decide the installation position of m…

100%1 / 126
SERVICE MANUAL
AVK3
2.0−2
D77SEC−11−000−A0
= MEMO =
2.1 Installation Procedure
SERVICE MANUAL
AVK3
2.1−1
D77SEC−11−040−A0
2.1 Installation Procedure
D77SEC−11−040−A0
Sentence No.
2.1.1 Installation Position
Installation position
1. Decide the installation position of machines from layout drawing (CAD drawing, etc.).
2. Mark the reference points of each machine on the floor with a marker pen, etc.
=NOTE=
In most cases, the machine front corners are used as reference points.
AVK3
JVK3B
BSF−V
C−CON
MBS
RHSG
C−CON
Reference points Reference points Reference points
*C−CON are connection conveyors which stand between machines.
3. Install the main body of each machine temporarily at reference points. (except for C-CON,
etc.)
4. The installation should start from the heaviest machine (A VK3).
AVK3
Reference points
5. Install the AVK3 main body accurately on reference points.
6. Decide the height from the floor to the transfer belt surface.
=Specification=
Height : 915±5mm
7. Adjust t he machine level (roughly).
8. Install other machines temporarily following the same procedure.
9. Install accessory conveyors such as C-CON, etc..
10. Raise the loader and unloader to the upper limit and adjust the clearance between the rails.
=Specification=
Clearance : 5±2mm
=NOTE=
If approx. 6mm cannot be provided between rails, move the machine.
11. Decide the height from the floor to the transfer belt surface.
=NOTE=
Depending on floor surface, there are times when transfer height can not reach
915mm.
12. Adjust the level between rails (front/rear, up/down directions).
2.1 Installation Procedure
SERVICE MANUAL
AVK3
2.1−2
D77SEC−11−040−A0
2.1.2 Leveling Machine
Leveling machine
1. Set machine main body accurately on the reference points.
2. Remove fixtures (for transportation) from X, Y, Z axes, etc.
Left feeder carriage
XY table
Z axis fixtures (2 pcs.)
XY axis fixture (1 pc.)
Right feeder carriage
=NOTE=
Make sure that feeder carriage sensor dogs do not interfere with the feeder carriage
sensors.
3. The machine main body is secured by 4 legs. Other legs are allowed to float.
DOWN
1 Rotation:3.5mm
Adjust bolt
4. Adjust the 4 legs and decide height from floor to transfer belt surface.
=Specification=
Height : 915±5mm
5. Set the level on the abraded face of XY table, adjust 4 legs to level the machine, and tighten
with locknuts. Place the levels in the designated positions on the machine (use 2 levels).
=NOTE=
Check that the levels are calibrated.
6. Adjust all other legs, and make sure the machine is still leveled (for AVK3, 8 4 = 4 legs).
7. Tighten all legs with locknuts and make sure the machine is still leveled. (check that there
are no floating legs).