N7201A616E00_0317.pdf - 第331页

NPM-W 2 EJM7DE-MB-05O-0 0 5-3-2 -2 Confirm the data name 5 5 Solder inspection

100%1 / 714
NPM-W2 EJM7DE-MB-05O-00
5-3-2-1
Capturing the images
of teaching PCB 1
Loading the production data
1
Operating procedure
5-3-2
The target device is switched to LNB.
(The filename of the data registered in
an LNB list is displayed.)
Choose the desired filename
(The selected filename is displayed in
light blue.)
Pressing [Date] sorts the filename in
descending order of date.
2
3
4
Produc-
tion data
and
teach
Confirm the message
3
2
4
1
(The data starts downloading)
This section describes how to capture an image of a PCB having soldered components, which is used for
data edit on “2D inspection editor”.
NPM-W2 EJM7DE-MB-05O-00
5-3-2-2
Confirm the data name
5
5
Solder
inspection
NPM-W2 EJM7DE-MB-05O-00
Capturing the images of teaching PCB
1
2
+
3
Confirm the message
4
Confirm the message
3
+
+
Capturing the images
of teaching PCB 2
Operating procedure
5-3-2
Produc-
tion data
and
teach
PCB after print means the condition
that no component is placed on the
PCB.
Uses to set the PCB color.
5-3-2-3
Loads a PCB and starts taking the image
of the entire PCB. The captured image
will be stored in the inspection BOX.)
PCB is unloaded after the mage is
taken.
A message appears when there are
not any PCBs in the upstream
machine.
1 2
4