N7201A616E00_0317.pdf - 第352页
NPM-W 2 EJM7DE-MB-05O-0 0 5-4-4 -7 1 + Confirm the message 1 (Automatic operat ion starts) Produc- tion Wr ong judgment input scr een 4 Operating procedure 5-4-4 Resuming production

NPM-W2 EJM7DE-MB-05O-00
1
2
■To judge per component
1
■ The number of NG judgments ≥ 100
(Components are not placed)
●Over 100 components have been
subject to inspection.
■To judge all at once
(All the undefined components are not
placed at once)
●Over 100 components have been
subject to inspection.
or
+
■When solder inspection is
performed before placement
●
PCB is placed according to the solder
inspection condition setting.
All subsequent placements are cancelled.
+
+
5-4-4-6
Solder
inspection

NPM-W2 EJM7DE-MB-05O-00
5-4-4-7
1
+
Confirm the message
1
(Automatic operation starts)
Produc-
tion
Wrong judgment input
screen 4
Operating procedure
5-4-4
Resuming production

NPM-W2 EJM7DE-MB-05O-00
Finishing production
Produc-
tion
5-4-5
1
1
2
2
3
4
OFF
Confirm the message
Confirm the message
Even though the message background blinks, it is
not machine trouble.
NOTE
Servo switch OFF
Since the inspection box (PC and UPS—Uninterruptible Power Supply) is connected to the machine with the
inspection head, shut down the inspection box before turning off the power to the machine.
●Failing to do so may shorten a battery life of UPS or disable communication with the inspection box next
time.
●When communication with the inspection box cannot be established, shut down the machine and wait for
one minute or more before restarting the machine.
Operating procedure
5-4-5
Solder
inspection