YSM10安装调整(eng).pdf - 第10页
For Ser v ice E n gineer Service Information SI1610004E -000= YSM10_Proced ures for the adjustmen ts required after installing a machine 10/107 3.3 When the monitor inter feres with the adjoining machine YSM1…

For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
9/107
3.2 Positions to set the levels and production line alignment
ysmQP@
xy@
I@
Figure 1
:
:
See Service Information “SI1004008E=General procedures for carrying in and installing a machine” for
the general procedures for installing a machine. It is possible to align a production
line with a standard jig for the production alignment
Figure 2
PU
< >
< >
Y-axis
frame
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/

For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
10/107
3.3 When the monitor interferes with the adjoining machine
YSM10
Figure 3
@ @ @
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/

For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
11/107
Work procedure
1.
Figure 4
2.
3.
Figure 5
4.
Figure 6
5