YSM10安装调整(eng).pdf - 第37页
For Ser v ice E n gineer Service Information SI1610004E -000= YSM10_Proced ures for the adjustmen ts required after installing a machine 37/107 13. Check and save the m easurement results. ・ ・ ・ ? Item Specified val…

For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
36/107
Adjustment for the machine with the Multi camera (Option)
9. Select multi camera “5-Digital MultiC”.
:
モMethod
Each Camera Head 1
Figure 44
10.
10-head type: Head 1 Head 10
5-head type: Head 1 Head 5
11. [Rec.Test] .
12. [Execute]
Q
Figure 45
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/

For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
37/107
13. Check and save the measurement results.
・
・
・ ?
Item
Specified value
Head Offset X
0.18mm or less with respect to 12.00 (24.0) pitch
Head Offset Y
0.06mm or less
Table 22
14.
Figure 46
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/

For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
38/107
4.14 Check the operation of the blow station (Option)
1. (ANC_TEST_YSM10_* or ACP_1005_*HEAD_*).
2.
[Cleaning Blow] on the [Unit] - [Head] .
[Cleaning Blow] , “Schedule Specification” VmSpec.
Figure 47
3.
“All object s” “Choose execution s” .
Figure 48
4.15 “
”
1. (ANC_TEST_YSM10_*).
2.
[Measure s]
Figure 49
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/