MEC-CP842-1.0E.pdf - 第222页
Setup >> Electrical Power Supply & Transformer Wiring 9-6 MEC-CP842-1.0E Wiring the T ransformer 1 Open the transformer box cover . 2 W ire the tran sformer ’ s primary taps to match the supplied voltage. < …

Setup >> Electrical Power Supply & Transformer Wiring
MEC-CP842-1.0E 9-5
5 After connecting the cable, secure it with the cable lock nut located at the power
cable inlet.
Cable lock nut tightening torque: 7.5 N⋅m (75 kgf⋅cm)
Power cable
%CDNGNQEMPWV
20mm
/CKPDTGCMGT
RJCUGYKTG
)TQWPFYKTG
C84SET001E

Setup >> Electrical Power Supply & Transformer Wiring
9-6 MEC-CP842-1.0E
Wiring the Transformer
1 Open the transformer box cover.
2 Wire the transformer’s primary taps to match the supplied voltage.
<
C
P
-
842
M
E><
C
P
-
842
E>
C746M6005
Transformer box
Transformer box

Setup >> Electrical Power Supply & Transformer Wiring
MEC-CP842-1.0E 9-7
Checking the Three-phase Connections
Perform the following procedure to verify that the three-phases are properly con-
nected.
1 Turn the 200V power on.
2 Log in the machine.
3 Press the [AUTO] button (but do not press START).
Note
1. Do not press the START button.
2. The vacuum pump begins operating when [AUTO] is pressed, so disconnect the hose to ver-
ify that suction exists. If there is suction, this indicates that the wiring is correct and the motor
is rotating in the correct direction. If the air flow is reversed (air is blowing out instead of in),
then turn the main power off and reverse the three-phase power cable’s U-phase and V-
phase connections, then try again.
Caution:To avoid leaks, the hose should be pushed firmly into position, and then secured in position
with the hose band.
C746M6006
<CP-842ME><CP-842E>
Hose
Hose band
air