00198168-02_Technical_Training_TX-Series_EN.pdf - 第5页

5 Technical Training SIPLACE TX-Series 10/2016 Table of Contents 5.2.4.3 GUI – How to Perform a Vacuum Check .. 107 5.2.5 Power Control and Communication .. 108 5.2.5.1 CAN Bus Overview .. 109 5.2.5.2 MHCU General …

100%1 / 266
4 Technical Training SIPLACE TX-Series 10/2016
Table of Contents
5.1.2.3 Vacuum CPP Holding Circuit.. 55
5.1.2.4 Pressure Regulator Valve (PRV).. 55
5.1.2.5 Intermediate Distributor.. 56
5.1.2.6 Vacuum Valve Board.. 56
5.1.2.7 Front Plate.. 57
5.1.2.8 Component Sensor.. 57
5.1.2.9 Retract Unit.. 58
5.1.2.10 Z Axis.. 58
5.1.3 Placement Process.. 59
5.1.3.1 Placement Positions.. 59
5.1.3.2 Placement Workflow.. 60
5.1.3.3 Standard Placement Workflow.. 64
5.1.4 Vacuum System Overview.. 66
5.1.4.1 Vacuum System Function Overview.. 66
5.1.4.2 GUI – How to perform a vacuum check.. 68
5.1.5 Overview Power Control and Communication.. 69
5.1.5.1 CAN bus.. 70
5.1.5.2 MHCU General.. 70
5.1.6 Board Description.. 72
5.1.6.1 Intermediate Distributor 1 and 2.. 72
5.1.6.2 Addressing the Contactless Energy Transformer.. 73
5.1.7 Calibration.. 73
5.1.7.1 Calibration Overview.. 73
5.1.7.2 Calibration Steps.. 75
5.1.8 Analyse.. 77
5.1.8.1 Error General Information.. 77
5.1.8.2 Vacuum Error.. 78
5.1.8.3 Star Axis Problem.. 79
5.1.8.4 Z Axis Problem.. 80
5.1.8.5 DP Drive Problem.. 81
5.1.8.6 Pick Up Problem (High Reject Rate).. 82
5.1.8.7 Placement Quality Issue.. 82
5.1.9 Error List and Maintenance.. 83
5.1.9.1 Common Error List.. 83
5.1.9.2 CPP Head - Maintenance.. 85
5.1.10 Excercise: CPP Head.. 87
5.2 C&P20 P/M2 Head.. 90
5.2.1 C&P20 P Head - Overview.. 90
5.2.1.1 Overview.. 90
5.2.1.2 Technical Data*.. 91
5.2.2 Main Parts/ Unit Overview.. 92
5.2.2.1 Z Axis Drive.. 92
5.2.2.2 Z Axis.. 92
5.2.2.3 Component Sensor.. 93
5.2.2.4 Retract Unit.. 93
5.2.2.5 Star Carrier.. 94
5.2.2.6 Star Motor.. 94
5.2.2.7 DP Drive.. 95
5.2.2.8 Star.. 95
5.2.2.9 Pressure Control Valve (PRV).. 96
5.2.3 Placement Process.. 96
5.2.3.1 Placement Positions.. 96
5.2.3.2 Placement Workflow.. 97
5.2.3.3 Standard Placement Workflow.. 101
5.2.4 Vacuum System Overview.. 104
5.2.4.1 Vacuum System Function Overview.. 104
5.2.4.2 Vacuum System Main Parts.. 105
5Technical Training SIPLACE TX-Series 10/2016
Table of Contents
5.2.4.3 GUI – How to Perform a Vacuum Check.. 107
5.2.5 Power Control and Communication.. 108
5.2.5.1 CAN Bus Overview.. 109
5.2.5.2 MHCU General.. 110
5.2.5.3 DP drive Power supply.. 111
5.2.6 Board description.. 112
5.2.6.1 Intermediate Distributor Board Functions.. 112
5.2.6.2 Intermediate Distributor Board LEDs.. 113
5.2.7 Calibration.. 114
5.2.7.1 Calibration.. 114
5.2.7.2 Calibration Steps.. 116
5.2.8 Analyse.. 118
5.2.8.1 Error General Information.. 118
5.2.8.2 Vacuum Error.. 119
5.2.8.3 Star Axis Problem.. 120
5.2.8.4 Z Axis Problem.. 121
5.2.8.5 DP Drive Problem.. 122
5.2.8.6 Pick Up (Reject) Problem.. 123
5.2.8.7 Placement Quality Issue.. 123
5.2.9 Error List and Maintenance.. 124
5.2.9.1 Common Error List.. 124
5.2.9.2 Maintenance.. 125
5.2.10 Excercise: C&P20 P Head.. 127
5.3 Twin Head.. 130
5.3.1 Overview.. 130
5.3.1.1 Overview.. 130
5.3.1.2 Technical Data.. 131
5.3.1.3 Main Parts / Unit Overview.. 132
5.3.2 Reference Run.. 133
5.3.3 Placement Process.. 135
5.3.4 Vacuum System Overview.. 139
5.3.4.1 Vacuum System.. 139
5.3.4.2 Station Software Vacuum Check.. 139
5.3.5 Handling.. 140
5.3.6 Board Description.. 141
5.3.7 Calibration.. 143
5.3.7.1 Pre Calibration Procedure.. 144
5.3.7.2 Calibration Steps.. 146
5.3.8 Analyse.. 148
5.3.8.1 Error General Information.. 148
5.3.8.2 Vacuum Error.. 149
5.3.8.3 Z Axis Problem.. 149
5.3.8.4 DP Axis Problem.. 150
5.3.8.5 Nozzle Change Problem During Production.. 150
5.3.8.6 Pick Up Problem (High Reject Rate).. 151
5.3.8.7 Placement Quality Issue.. 151
5.3.9 Maintenance.. 152
5.3.10 Excercise: Twin Head.. 152
6 Component Supply.. 155
6.1 Change Over Table (COT).. 155
6.1.1 Location.. 155
6.1.2 Overview COT.. 155
6.1.3 COT Feeder Configuration.. 156
6.1.4 Height Adjustment.. 157
6 Technical Training SIPLACE TX-Series 10/2016
Table of Contents
6.2 Docking Station and COT Insert.. 158
6.3 Feeder Control Unit (FCU).. 159
6.4 Tape Cutter.. 159
6.5 Reject plate on TX.. 160
6.6 Component Supply Pneumatic & Electrical System.. 161
6.6.1 Overview Pneumatic System.. 161
6.6.2 Overview Electrical System.. 162
6.7 Nozzle Changer for C&P20 P/M2 / CPP and Twin Heads.. 163
6.7.1 Nozzle Changer Twin Head.. 164
6.8 Analysis - Common Error List.. 165
6.9 Excercise: Component Supply.. 165
7 Conveyor System.. 169
7.1 Main Overview.. 169
7.2 Specification.. 171
7.3 Conveyor Functionality.. 172
7.3.1 TX Board monitoring and clamping.. 172
7.3.2 Width adjustment.. 175
7.3.3 Reference run.. 175
7.3.4 PCB convoy mode.. 176
7.4 Overview Conveyor Electrical System.. 177
7.5 Parts Exchange / Settings / Calibration.. 178
7.5.1 Parts Exchange / Adjustment or Setting.. 178
7.5.2 Calibration after Repair / Adjustment.. 180
7.5.2.1 Explanation of the conveyor calibrations.. 180
7.5.2.2 Calibrating the motor (Lifting)/ Checking the motor current (Lifting/ Transport/ Width).. 180
7.5.2.3 Calibrating the conveyor width.. 181
7.5.2.4 Board reference corner.. 183
7.5.2.5 Teaching the sensor.. 184
7.5.2.6 Adjust Shuttle.. 185
7.5.3 Changing the Conveyor Configuration.. 186
7.5.3.1 Changing the fixed conveyor rail width positions.. 186
7.5.3.2 Adjusting the fixed rail: Outer/ Right/ Left.. 187
7.5.3.3 Conveyor Settings in SIPLACE Pro and GUI.. 187
7.6 Analysis - Common Error List.. 188
7.7 Maintenance.. 189
7.8 Excercise: Conveyor System.. 189
8 Power Supply .. 193
8.1 Overview of the Switched Mode Power Supply SMPS.. 193
8.2 Wiring colour description.. 195
8.3 Voltage Overview Block diagrams.. 196
8.3.1 Circuit Diagram of Power Supply TX.. 196
8.3.2 300 V Intermediate Circuit Voltage for Main Axes.. 197
8.3.3 160 V Intermediate Circuit Voltage for Head Axes.. 198
8.3.4 42 VDC Switched and Unswitched.. 199
8.3.5 24 VDC Switched and Unswitched.. 200
8.3.6 28 VDC Unswitched.. 202
8.4 Overview of Fuse board FD:A1.. 203
8.5 Function Description of Individual Assemblies SMPS TX.. 204