00194474-0702_AI_HeadReconfig_X_605_DE+EN.pdf - 第175页

Head Reconfiguration Kits 2 Assemb ly Instructions - SIPLACE X-Series Head Reconfiguration Kits 07/2010 Edition 175 : Remove the nozzle station a nd the cable clip. 2 2 : Refit the cover on the component trol ley docki n…

100%1 / 276
2 Assembly Instructions - SIPLACE X-Series Head Reconfiguration Kits Head Reconfiguration Kits
07/2010 Edition
174
: Disconnect the air hose.
Close the Y piece using a 00330249 plug QSC-4H
.
2
2
: Remove the nozzle station valve completely.
2
2
2
2
2
2
2
2
2
Y adapter
Solenoid valve
Head Reconfiguration Kits 2 Assembly Instructions - SIPLACE X-Series Head Reconfiguration Kits
07/2010 Edition
175
: Remove the nozzle station and the cable clip.
2
2
: Refit the cover on the component trolley docking unit.
2
2
2
2
2
2
2
2
2
2
2
2
Cable clip
Nozzle station
2 Assembly Instructions - SIPLACE X-Series Head Reconfiguration Kits Head Reconfiguration Kits
07/2010 Edition
176
2.10.4 Removing the C&P20 placement head
2
Wear an ESD armband for the whole time you are working on the placement head and servos. 2
2
2
2
Remove the axis cards and servo cards.
Please note the overviews in the appendix Chapter 2.14.1 or Chapter 2.14.2. 2
2
2
The conversion is easiest to carry out from locations 2 and 4. 2
2
2
: Disconnect the two ribbon cables.
2
Remove
ribbon cable