Dual Simultaneous Programmable Pitch Rev 02.pdf - 第64页
© 2024 Nordson Corporation 60 5 Ma in te nance a nd Serv i c e 5.1 Overview There are no recommend ed maint enance and serv ice procedures f or the DSPP. Once install ed and configured, the DS PP is designed to perform w…

Dual-Simultaneous Programmable Pitch Owner’s Manual Operation
© 2024 Nordson Corporation 59
27. Click the Run button to run the new program.
28. Check the results (Figure 4-76).
Figure 4-76 Check Results
29. Adjust parameters and rerun the program as needed until the desired results are achieved.

© 2024 Nordson Corporation 60
5 Maintenance and Service
5.1 Overview
There are no recommended maintenance and service procedures for the DSPP. Once installed and
configured, the DSPP is designed to perform with no other maintenance or service required.
For questions or concerns, please contact Technical Support.

© 2024 Nordson Corporation 61
6 Troubleshooting
6.1 Overview
To quickly identify problems, look for obvious signs such as burnt, missing, damaged, or loose parts, as
well as obstructions and spills. Recurring problems indicate there may be other root causes. Table 6-1
identifies troubleshooting symptoms, recovery procedures, hierarchy, and setup variables.
?
NOTE
Refer to the EasyCoat User Guide or EasyCoat Help for recovery procedures pertaining
to EasyCoat.
6.2 Safety First
Operation of the Dual-Simultaneous Programmable Pitch involves mechanical devices and electrical
power. It is essential that every person servicing or operating the DSPP fully understands all hazards,
risks, and safety precautions. See Section 2 - Safety for additional information.
WARNING!
Allow only qualified personnel to perform the following tasks. Follow the safety
instructions in this document and all other related documentation.
WARNING!
Ensure the fluid system is completely depressurized prior to loosening any fittings
in the fluid path. Failure to do so may cause serious injury to personnel.
WARNING!
DO NOT hot swap connections when working with electrical and pneumatic power
supplies. Turn the main circuit breaker off before disconnecting the external power
plug from the facility.