SIPLACE X-Series (SIPLACE X-Series S, from SC 708.1) Edition 05/2015 EN User manual.pdf - 第410页
7 Maintenance User manual SIPLACE X-Series 7.2 Heads and nozzles From software version 708.1 Version 05/2015 410 7.2 Heads and nozzles 7.2.1 Maintenance tasks for Multistar CPP 7 * See also maintenance display Maintenanc…

User manual SIPLACE X-Series 7 Maintenance
From software version 708.1 Version 05/2015 7.1 Basic machine
409
7
7
7
7
7
* See also maintenance display
** 3 shift operation. This value applies for 3 shift production (7500 operating hours). Lon
-
ger intervals can be planned for other shift structures. Please also observe the manu
-
facturer's maintenance instructions.
Maintenance tasks on the camera systems Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Clean the IC and FC cameras 4 X
Clean the stationary 3D sensor module 2 X
Clean the PCB barcode scanner 2 X
Maintenance tasks for gantry Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Grease the X axis guide bearing 2 X*
Grease the Y axis guide bearing 2 X*
Clean the X axis linear guides 2 X
Clean the Y axis linear guides 2 X
Clean the X axis scale 2 X
Clean the Y axis scale 2 X
Maintenance tasks for conveyor Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Adjust the conveyor edges for DC 2 X
Clean and preserve the conveyor
▪ Hexagonal shafts
▪ Clamping surfaces on the basic carrier
▪ Ball recirculating spindle
▪ Guidance rail of width adjustment
▪ Linear guide rail for the conveyor sides
11 X
Maintenance tasks for vacuum pump Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Check/replace the filter insert 15 X**
Maintenance tasks for Smart Pin Support Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Clean the interface 2 X
Clean the pins 3 (per
5pins)
X

7 Maintenance User manual SIPLACE X-Series
7.2 Heads and nozzles From software version 708.1 Version 05/2015
410
7.2 Heads and nozzles
7.2.1 Maintenance tasks for Multistar CPP
7
* See also maintenance display
Maintenance tasks for
Multistar CPP
(6 monthly or at 40 mill. components)
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Prepare the placement head 2 X*
Replace the pressure control valve 3 X*
Maintenance tasks on vacuum-conducting parts
▪ Dismantle the screwed joint and the silencer
▪ Check/replace the silencer
▪ Dismantle the holding circuit
▪ Clean the holding circuit housing
▪ Replace the O-rings on the holding circuit housing
▪ Clean the screwed joint
▪ Fit the holding circuit, the silencer and the screwed
joint
8X*
Oil the Z-axis support roller 2 X*
Oil the Z axis linear guide 1 X*
Check/replace the DP vacuum hoses 1.5/hour X*
Clean the light barrier on the DP drive 15 X*
Oil the DP segment guide 4 X*
Oil the DP driver bearing 6 X*
Replace the filter disks 3 X*
Oil the star bearing 3 X*
Clean the component sensor 1 X*

User manual SIPLACE X-Series 7 Maintenance
From software version 708.1 Version 05/2015 7.2 Heads and nozzles
411
7.2.2 Maintenance tasks for Speedstar C&P20 and C&P20 P
7
* See also maintenance display
7.2.3 Maintenance tasks for TwinStar
7
7.2.4 Maintenance tasks for nozzles
7
Maintenance tasks for
Speedstar C&P20/A/M/P
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Prepare the placement head 5 X*
Replace the pressure control valve 3 X*
Clean the Z axis 6 X*
Oil the DP segment guide 15 X*
Oil the Z axis linear guide 3 X*
Oil the DP driver bearing 4 X*
Check/replace the vacuum-conducting parts
▪ Aperture ring and cover
or
▪ Holding circuit and silencer
5X*
Clean the raceway and the jaws 2 X*
Replace the filter disks 15 X*
Check/clean/replace the switching disks 1/hour X*
Clean the component sensor 1 X*
Maintenance tasks for Twin Duration
[min]
Each
week
Every 3
months
Every 6
months
Every
12
months
Prepare the placement head 5 X
Replace the pressure control valve 3 X
Clean the sleeve and nozzle seat 2 X
Clean/replace the additional volume filters 2 X
Maintenance tasks for nozzles Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Clean/replace the ceramic nozzles 2 X
Replace the plastic nozzles 2 X