YSM20R_YSM20WR_Mainte_E.pdf - 第181页
6-25 6 How to replace consumable parts 5. Base 5.1 Replacing carriage clamp valve T he clamp valve for feeder exc hange carriage locates on the bottom left of machine front. When the valve has a problem, replace it with …

6-24
6
How to replace consumable parts
n
Example: Single-lane type
1
Turn off the air supply and power
off the machine.
1. Exit the software and power off the
machine.
2. Turn the “Air supply/exhaust” switch
(valve) clockwise (Exh) to turn off the air
supply.
2
Disconnect the connector.
Disconnect the connector of relevant valve.
n
NOTE
See the mark tube for the connector wiring of relevant
valve.
3
Replace the valve.
1. Remove bolts (2 each) mounting relevant
valve with Phillips precision screwdriver.
2. Attach a new valve.
3. Connect the connector.
c
CAUTION
Packing is on rear of valve. Make sure not to drop or
pinch it when replacing the valve with new one.
4
Check the valve operation.
1. Turn on the supply air and power on the
machine.
2. Check the replaced valve operation on
[Unit] - [I/O] screen.
n
NOTE
The figure below is an example of transfer direction
from right to left. Check the actual address and
operate the valve after replacing it.
Checking conveyor valve operation
Single-lane type (Example: Transfer direction from right to left)
Select “CONVEYOR” from “Output”.
Select address.
7
6
5
3
2
1
Mark tube
Address Description
Sub stopper 1: L 510 mm (OP)
Sub stopper 2
Main stopper
Exit stopper
Clamp board (Small): L 510 mm (OP)
Clamp board (Large)
T010001
T010001
T010001
T010002
T010002
T010002
[ON/OFF] button Address description
Example: T010001-5
Address
T010001
T010002
Type
CONVEYOR
CONVEYOR
7 6 5 4 3 2 1 0
0
0
00
0 00
00 00
CV ST1
CV ST2
CV ST3
CV ST5
CLAMP1
CLAMP3
54604-KMK-00
Disconnecting valve connector
Step 2
Connector
53633-KMK-00
Replacing valve
Step 3
Phillips precision
screwdriver
Valve
Packing is on rear of valve.
Make sure not to drop it.
53634-KMK-00

6-25
6
How to replace consumable parts
5. Base
5.1 Replacing carriage clamp valve
The clamp valve for feeder exchange carriage locates on the bottom left of machine front. When the valve has
a problem, replace it with the following procedure.
1
Turn off the air supply and power
off the machine.
1. Exit the software and power off the
machine.
2. Turn the “Air supply/exhaust” switch
(valve) clockwise (EXH) to turn off the air
supply.
2
Disconnect the connector.
Disconnect the connector of relevant valve.
n
NOTE
See the figure on the right and mark tube of valve
connector for the relevant valve and the position.
TIP
The double solenoid valve controls the clamp/unclamp
of carriage.
3
Replace the valve.
1. Remove bolts (2 each) mounting relevant
valve with Phillips precision screwdriver.
2. Attach a new valve.
3. Connect the connector.
c
CAUTION
Packing is on rear of valve. Make sure not to drop or
pinch it when replacing the valve with new one.
Disconnecting valve connector
Step 2
Connector
Valve position and operation
F1 Down
F2 Down
R1 Down
R2 Down
Light UP1
Light UP2
F1 UP
F2 UP
R1 UP
R2 UP
F1 Down
F2 Down
R1 Down
R2 Down
Light UP1
Light UP2
F1 UP
F2 UP
R1 UP
R2 UP
Operation
Clamping carriage on front left
Clamping carriage on front right
Clamping carriage on rear right
Clamping carriage on rear left
Raising multi-camera side light on front
Raising multi-camera side light on rear
Unclamping carriage on front left
Unclamping carriage on front right
Unclamping carriage on rear right
Unclamping carriage on rear left
Mark tube
Replacing valve
Step 3
Phillips precision
screwdriver
Valve (single solenoid)
Valve (double solenoid)
Packing is on rear of valve.
Make sure not to drop it.
53629-KMK-00
53630-KMK-00

6-26
6
How to replace consumable parts
4
Check the valve operation.
1. Turn on the supply air and power on the
machine.
2. When replaced carriage clamp/unclamp
valve, clamp and unclamp the carriage
to check that carriage can be set
correctly.
TIP
The carriage clamp valve operation can be also
checked on [Unit] - [I/O] screen. See the figure below.
3. When replaced valve for raising multi-
camera side light, check the operation
on [Unit] - [I/O] screen.
n
Checking valve operation on "I/O" screen
Check the valve operation as below after replacing it.
Checking valve operation
5
7
6
Example: T010000-3
Address
T010000
Type
FEEDER
7 6 5 4 3 2 1 0
0
00 0 0 000
Example: T01000C-4
Address
T01000C
Type
LIGHT
7 6 5 4 3 2 1 0
00
Carriage
2
1
0
4
3
Address
T010000
T010000
T010000
T010000
T010000
T010000
T010000
T010000
F1
F2
R1
R2
UNCLAMP
CLAMP
UNCLAMP
CLAMP
UNCLAMP
CLAMP
UNCLAMP
CLAMP
Description
[Unit] - [I/O] screen
Select “FEEDER” from “Output”.
Multi-camera
5
4
Address
T01000C
T01000C
UP
UP
TABLE-A (Front)
TABLE-B (Rear)
Description
Carriage clamp (reference)
Multi-camera
Select address.
[ON/OFF] button Address description
Select “LIGHT” from “Output”.
[ON/OFF] button Address description
54605-KMK-00