00197369-02_AI_PPW_2te_Reihe_X-Serie-S_de_en.pdf - 第73页
Installation 3.1.4 Location 1 and 3 – Installing the "Support Option ASP Spe ed Flex Row 2 SP1/3" X4i S - Installing the NC Row 2 NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC 73 Install…

Installation
X4i S - Installing the NC Row 2 3.1.3 Preparing the Compressed Air Connection
72 NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC
3.1.3
3.1.3 Preparing the Compressed Air Connection
Preparing the Compressed Air Connection
To connect the second nozzle changer, you need to branch off the line to the nozzle station.
► Use diagonal cutters to cut the supply line to the nozzle station about 5 cm behind the Y coupling.
3.1.4
3.1.4 Location 1 and 3 – Installing the "Support Option ASP Speed Flex Row 2 SP1/3"
Location 1 and 3 – Installing the "Support Option ASP Speed Flex Row 2 SP1/3"
Parts required from "Support option ASP speed flex row 2" [03090225-xx]
NC option mount
Branched line to nozzle station
1. Y coupling for supplying the nozzle station and NC 2
2. 2A: Original line to nozzle station
2B: Branched line to nozzle station
3. Line to NC 1
4. Connection for line to NC2
► Fit a Y coupling (1) to the original end of the line lead-
ing to the nozzle station (2A).
► Fit the branch end of the line leading to the nozzle
station (2B) into the corresponding connection on the
Y coupling.
► Plug the line leading to NC2 into the connection at (4)
when installing the NC2.
Quantity Designation Item number
2 NC option mount 03005337-xx
2 ISO4762 - M5 x 14-A2-70 03043120-xx
At locations 1 and 3 you need the NC option mount
[03005337-xx] with prefitted shim plates for the left and
right sides.

Installation
3.1.4 Location 1 and 3 – Installing the "Support Option ASP Speed Flex Row 2 SP1/3" X4i S - Installing the NC Row 2
NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC 73
Installation
Attaching the mount – example of right side
► Fit the mount for the second row from the left, onto
the mount for the first row.
► Press the mount down firmly so that the two align-
ment pins (1) and (2) are completely inserted into the
relevant holes on the front mount.
Screwing the mount into place – example of right side
► Screw the mount for the second row into place from
the left side (1).

Installation
X4i S - Installing the NC Row 2 3.1.4 Location 1 and 3 – Installing the "Support Option ASP Speed Flex Row 2
74 NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC
► For configurations without Smart Pin Support, continue with section "3.1.8 Checking the Height"
[➙80].
► For configurations with Smart Pin Support, continue with section "3.1.7 Inserting the NC ASP Sup-
port Plate" [ ➙ 78].
See also
3.1.5 Location 2 and 4 – Installing the "Support Option ASP Speed Flex Row 2 SP1/3" [ ➙ 75]
NC option mount installed (left side)
1. Alignment pins
2. Fastening screw
NC option mount installed (right side)
1. Alignment pins
2. Fastening screw