00197369-02_AI_PPW_2te_Reihe_X-Serie-S_de_en.pdf - 第92页
Installation X3 S / X4 S - Installing the NC Row 2 3.2.4 Location 2 with WPC and Twin/CPP 92 NC Row 2 - NC in Front of MTC 2/WPC PPW 2te R eihe - PPW vor MTC 2/WPC 3.2.4 3 . 2 . 4 L o c a t io n 2 w it h W P C a n d T w …

Installation
3.2.3 Location 2 with MTC X3 S / X4 S - Installing the NC Row 2
NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC 91
3.2.3.2
3.2.3.2 Installation
Installation
3.2.3.3
3.2.3.3 Installing the NC in front of the MTC
Installing the NC in front of the MTC
Nozzle Changers
► Fix the nozzle changer onto the two holders with four
screws DIN912-M5x14-8.8 [03045068-xx].
Installation position for nozzle changer in front of MTC
Before the nozzle changer can be fitted onto the COT in-
sert contact surface, the pressure plate from the upgrade
kit must be screwed to the left side of the nozzle changer
holder.
Right side
► Fit the support plate and insert the nozzle changer
holder into its installation position.
► Fix the nozzle changer holder to the contact surface
of the COT insert with a screws each at (1) and (2),
on the right sides.
Left side
► Fix the holder on the left side to the front point (3) and
the back point (not visible on photo).
Item (4) shows the fixture points on the pressure plate.

Installation
X3 S / X4 S - Installing the NC Row 2 3.2.4 Location 2 with WPC and Twin/CPP
92 NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC
3.2.4
3.2.4 Location 2 with WPC and Twin/CPP
Location 2 with WPC and Twin/CPP
See also
3.2.4.2 Removing the NC Row 1 [ ➙ 93]
3.2.4.3 Preparing the Compressed Air Connection [ ➙ 94]
3.2.4 Location 2 with WPC and Twin/CPP [ ➙ 92]
3.2.4.1
3.2.4.1 Overview
Overview
Parts required from the upgrade kit
For Twin:
For CPP:
Basic assembly NC row 2/W5 magazine
CAUTION
Twin and CPP
Observe the different parts lists for Twin and CPP.
Designation Item number
1 Basic assembly NC row 2 WPC basic assembly 03115109-xx
1 Nozzle changer TH SX series (position 1) 00519845-xx
2 ISO4762 - M8 x 70-A2-70 03042595-xx
1 Compressed air line for nozzle station
Quantity Designation Item number
1 Basic assembly NC row 2 WPC
Contains: NC_short for CPP, 3x magazine type 20, 1x magazine
type 28
03113144-xx
2 ISO4762 - M8 x 70-A2-70 03042595-xx
1 Compressed air line for nozzle station
Basic assembly for WPC
NOTICE!
Installation of the basic assembly is the same for Twin
and CPP. Any relevant differences will be mentioned ex-
plicitly.

Installation
3.2.4 Location 2 with WPC and Twin/CPP X3 S / X4 S - Installing the NC Row 2
NC Row 2 - NC in Front of MTC 2/WPC PPW 2te Reihe - PPW vor MTC 2/WPC 93
Installation position for basic assembly
3.2.4.2
3.2.4.2 Removing the NC Row 1
Removing the NC Row 1
Before you can fit the basic assembly for the nozzle changer row 2 and connect the nozzle changer, you
need to remove the nozzle changer in row 1.
► Unplug the connection cable and the compressed air line and then place the nozzle changer to one
side.
► Expose the connection cables x1*b, x1*c and x1*d.
Fixture points on COT insert
The installation place for the basic assembly is behind the
first row of nozzle changers. This basic assembly is fixed
by the middle fixture points on the left and right (1) to the
COT insert support.
Basic assembly and installation point
1. Installation point for nozzle magazine assembly
2. Support plate for W5 magazine
3. Groove for guiding the compressed air line for the
nozzle changer stations
4. Fixture points for the basic assembly on left and right
Nozzle changer in row 1
► Remove the fastening screws at (1) to (2).