BM料架治具使用手册.pdf - 第39页

Feeder Inspection Unit 3.2 Connecting Method 3.2−2 DX1OEC−1 1−080−A0 Detailed Drawing of Power Box Connection PNL cable (Power box − Adjust unit) • T ighten screws on both ends of the connector . Ground cable • Be sure t…

100%1 / 100
3.2 Connecting Method
Feeder Inspection Unit
3.2−1
DX1OEC−11−080−A0
3.2 Connecting Method
DX1OEC−11−080−A0
Sentence No.
Before using the adjust unit, connect the jig, power box and monitor via cables.
At this time, connect the air tube to the jig as well.
=REFERENCE=
The breaker is not provided with earth leakage detection function. Therefore, be sure to ground
the power box. (If necessary, an earth leakage breaker should be provided by the customer.)
=REMARKS=
Before connecting the cables, be sure to turn OFF the main switch and breaker.
Camera
Power cable for power box
(Power supply: 100 to 240V AC)
Valve
Air tube
* To be provided
by the customer.
PNL cable
(Power box Adjust unit)
Power box
Camera cable
(Power box Camera)
Monitor
Rear
Monitor signal cable
(Power box Monitor)
Monitor power cable (Option)
(Power box Monitor)
* Provided with the optional monitor only.
Adjust unit
Feeder Inspection Unit
3.2 Connecting Method
3.2−2
DX1OEC−11−080−A0
Detailed Drawing of Power Box Connection
PNL cable
(Power box Adjust unit)
Tighten screws on both ends of
the connector.
Ground cable
Be sure to connect the ground cable.
Power cable for
power box
Set screw
Screw
Camera cable
(Power box Camera)
Monitor signal cable
(Power box Monitor)
Monitor power cable
(Option)
(Power box Monitor)
Detailed Drawing of Monitor (Option) Connection
Monitor signal cable
(Power box Monitor)
Monitor power cable
(Option)
(Power box Monitor)
3.2 Connecting Method
Feeder Inspection Unit
3.2−3
DX1OEC−11−080−A0
Detailed Drawing of Air Connection
Camera
(1)
Insert the air tube while
pushing upward.
(2)
After connecting the
air tube, secure it
with a clip.
Valve
Air tube (φ6)
Screw
Clip
Valve
Air tube (φ6)