EUKYX-199-4110_G5S2_Instruction_Vol4_E.pdf - 第67页

EUKYX 1-18 199-4100 4. Inspection, Cleaning, and Lubrication Spots 4. I n s pecti on , Clea n i ng , and Lu br ic atio n Spots The fol lowi ng descri bes t he ma intena nce tasks re qui re d for ea ch i ndi vid ual u ni …

100%1 / 363
EUKYX
1-17199-4100
3.1 Whole View
(Front Side of Machine)
(Rear Side of Machine)
Nozzle Stocker Section
PCB Positioning Section
Head Section
XY Beam Section
Component Recognition
Camera Section
Cutter Section
Feeder Base Driving Section
F4A7
EUKYX
1-18199-4100
4. Inspection, Cleaning, and Lubrication Spots
4. Inspection, Cleaning, and Lubrication Spots
The following describes the maintenance tasks required for each individual units.
Refer to “2. Maintenance Check List” in this chapter for the maintenance items classified
based on frequency.
4.1 Air Source
4.1.1 Air Blow Pressure Inspection
Cycle : Every Day (Required Time : 1 minute)
Air Blowing Pressure
F4A8
Visually check that the pressure gauge reads the initial setting 0.05 MPa (0.5 kgf/cm
2
).
The pressure is factory-adjusted upon shipment of the machine.
Do not change the pressure unless necessary.
Reference
Procedure
Notice
EUKYX
1-19199-4100
4.1 Air Source
4.1.2 Main Air Pressure Inspection
Cycle : Every Day (Required Time : 1 minute)
Main Air Pressure
F4A9
Visually check that the set air pressure is 0.45 MPa (4.6 kgf/cm
2
) and "Min. 0.4 MPa (4.1 kgf/
cm
2
)" while the machine is running. If not, adjust the set air pressure.
4.1.3 Drain Cleaning
Cycle : Every Week (Required Time : 5 minutes)
Cap
Drain
F4A10
Prepare a container and pull down the black cap each on the filter case lower section to drain.
Procedure
Procedure