PCBRM_User_Manual_R9.pdf - 第28页

PCBRM15 & PCBRM System 5.2 User’s Manual Chapter 3: Set Up & Installation Part No. 4005.00.906 3-2

100%1 / 120
PCBRM15 & PCBRM System 5.2 User’s Manual Chapter 3: Set Up & Installation
Part No. 4005.00.906 3-1
3: Set Up & Installation
3 Set Up & Installation ......................................................................................................................3
3.1 Leveling Module..............................................................................................................................................3
3.2 PCBRM15 – Carrier Arms Installation.......................................................................................................4
3.3 PCBRM System 5.2 - Carrier Arms Installation........................................................................................7
3.4 PCBRM System 5.2 – X Axis Stops, Set Up, Function...............................................................................8
3.5 PCBRM System 5.2 – Z Axis Stop, Set Up, Function ................................................................................9
3.6 PCBRM System 5.2 - Preheater Safety Stop.............................................................................................10
3.7 Optional Fume Extraction Manifold Assembly Installation...................................................................11
PCBRM15 & PCBRM System 5.2 User’s Manual Chapter 3: Set Up & Installation
Part No. 4005.00.906 3-2
PCBRM15 & PCBRM System 5.2 User’s Manual Chapter 3: Set Up & Installation
Part No. 4005.00.906 3-3
3 Set Up & Installation
3.1 Leveling Module
CAUTION:
OPERATION OF THIS MODULE INVOLVES PUMPING OF MOLTEN SOLDER. ALL NORMAL SAFETY
PRACTICES SHOULD BE OBSERVED WITH SPECIAL ATTENTION TO THE FOLLOWING:
SAFETY GLASSES SHOULD BE WORN AT ALL TIMES.
DO NOT MOVE MODULE WHILE SOLDER IS MOLTEN.
DISCONNECT POWER BEFORE SERVICING MODULES.
CAUTION:
LEVELING OF MODULE SHOULD NOT BE ATTEMPTED WITH MOLTEN SOLDER IN THE POT.
Note:
LEVELING IS CRITICAL TO PROVIDE CORRECT SOLDER FLOW.
Level machine on table.
Place the level (supplied with tool kit) on Pump Housing (A). Level machine (front to back and
side to side) by adjusting the Leveling Legs.
After leveling is completed, lock legs with jam nuts.
(A)