CM88Maintenace1.pdf - 第57页
Page 1-19 REGULAR MAINTENANCE 1 1-3 Check Every 24 Hours (Routine) 1-3-1 Checking the V acuum Pressure (before Operation) Check that the vacuum pressure is higher than - 93.3 kPa with a pressure gauge. ∗ If any abnormal …

Page 1-18
Lubricating
List of oil
3Y3C-055TE
3Y3C-E-MMD01-A02-00
.oN noitacirbulfostraP sepytliO emanliO srekaM
1
raerdnatnorf,elbatY-X,redlohdraoB
sixaevirdredeefdna,royevnoc
esaerG2AINABLA
LLEHSAWOHS
2
,regnahcelzzon,xobmac,sixaniaM
noitcestnuom,redeefepat
esaerG2UTNAILAV
3ecivedgnixednirofliOlioraeG022THOSEHTNYS
REBULKKON
4
daehrefsnarT
)gnir-Odna,gnikcapYM,gniraeb(
rofesaergeniroulF
muucav
V/LEIATREIRRAB

Page 1-19
REGULAR
MAINTENANCE
1
1-3 Check Every 24 Hours (Routine)
1-3-1 Checking the Vacuum Pressure (before Operation)
Check that the vacuum pressure is higher than - 93.3kPa with a pressure gauge.
∗ If any abnormal pressure is found, make
contact with the service department of us.
Make sure of the vacuum pressure
higher than - 93.3kPa
The figure viewed from the rear side with
the top cover of main body opened.
1-3-2
Checking for the Strange Noise (after Starting up and during Operation)
Check for the strange noise of X-Y table, front and rear conveyors, and feeder drive axis after
starting up and running machine.
Feeder drive axis
Rear conveyor
Front conveyor
X-Y table
3Y3C-027P
07JGC2AA00
4G3C-AB01
07JHC2AA
3Y3C-E-MMD01-A03-03
kPa
-20
-40-60
-80
-100
0

Page 1-20
Check Every 24 Hours (Routine)
1-3-3 Blower : Casting off the Tape (after Operation)
Discharge the waste tape in the blower.
Tape corrector
Waste tape
Case
3Y3C-028P
3Y3C-E-MMD01-A03-01