KE-750_MS.pdf - 第101页
4. Feeder Bank PWB / Feeder Interface PWB Replacement Feeder interface PWB A ir coupler nipple PJ032009005 E93887210A0 Feeder bank relay cable 3 E2641721000 Connector bracket Fig. 9-4-1 Replacement sequence (1) Disconnec…
3. Drive Cylinder Speed Control Adjustment
For adjustment of up/down speed of numerous cylinders
(1) Disconnect drive cylinders needing adjustment from driver bracket.
(Refer to 9 - 1 - (1)~(4).)
(2) Connect air tube (1) with connector (2).
(3) Turn on mains air and power.
(4) Using In/Out manual control, continuously all drive cylinders of the speed controller to be regulated.
(5) Regulate the cylinders with the speed controller. Judge by eye that movement is the same as the
other cylinders. (Refer to Dia. 9 - 2 - 1.)
(6) After tightening speed controller nut to secure setting, verify movement one more time.
(7) Reassemble in reverse sequence.
1-93

4. Feeder Bank PWB / Feeder Interface PWB Replacement
Feeder interface PWB
A
ir coupler nipple
PJ032009005
E93887210A0
Feeder bank relay cable 3
E2641721000
Connector bracket
Fig. 9-4-1
Replacement sequence
(1) Disconnect feeder bank relay coupler 3 & air coupler nipple from main body.
(2) Remove mounting screws and disconnect connector from main body.
(3) Disconnect plug connectors of feeder bank PWB or feeder interface.
(4) Remove the 8 small pot screws of the feeder bank PWB or the 4 screws of the feeder interface PWB
and replace with a new board.
(5) Reassemble in reverse sequence.
1-94

5. Bank Up Cylinder Replacement (Optional One-Shot Replacement Base)
Selecto
r
PV0151170A0
Roller leve
r
PV010505000
Bank lifte
r
Fig. 9-5-1
(1) Turn main power source OFF
(2) Turn selector & left / right roller levers ON. Raise bank lifter.
(3) Loosen and remove bank up cylinder rod & lifter cylinder shaft.
(Dia. 9 - 5 - 2) On side to be replaced
1-95