KE-750_MS.pdf - 第36页

6-2 LA Sensor Replacement (LA, LAIC Head) After replacement of LAHD, reentry of MS parameters for the laser is required. (Refer to section 2 - 13 for reentry.) After replacement, wipe the LAHD laser window with alcohol. …

100%1 / 257
6. Laser Sensor Replacement
6-1 LAHD Replacement (LAHD Head)
After replacement of LAHD, reentry of MS parameters for the laser is required. (Refer to section 2 - 13
for reentry.) After replacement, wipe the LAHD laser window with alcohol.
To replace, remove connector (1) and the 3 screws (2).
LAHD
A
llen head scre
w
(SM6852002TN)
Note: For the Allen head screws (2), use Locktite 242 and tighten to torque 4kg-cm.
Fig. 2-6-1
1-29
6-2 LA Sensor Replacement (LA, LAIC Head)
After replacement of LAHD, reentry of MS parameters for the laser is required. (Refer to section 2 - 13
for reentry.) After replacement, wipe the LAHD laser window with alcohol.
To replace, remove connectors (1), (2) & (3) and the 4 screws (4).
SEMS cap scre
w
(SL6040842TN)
LA senso
r
Head bracket
Fig. 2-6-2
1-30
7. Head Up Spring Replacement
Remove head up spring (4) from spring stud (3) and replace. (Dia. 2 - 1 - 1~3)
8. Coupling θ Replacement
(1) Loosen the 2 screws (1), (2) in coupling θ and remove coupling.
(2) To mount, insert coupling all the way onto Z slider shaft and secure with screw (1). Tighten screw
(2) to fix spline shaft so that the dimensions given below are achieved.
Spline shaft
Screw (2)
M3
Screw (1)
M2.5
Z slider shaft
Fig. 2-8-1
1-31