KE-750_MS.pdf - 第103页

Left PA500750200 Right PA500750100 Bank up detec Bank up cylinder tor cable Bank up detector cable Bank up cylinde r mounting screw E2756721000 Lifter cylinder shaft Drive cylinder ass y mounting screw Bank lifte r Only …

100%1 / 257
5. Bank Up Cylinder Replacement (Optional One-Shot Replacement Base)
Selecto
r
PV0151170A0
Roller leve
r
PV010505000
Bank lifte
r
Fig. 9-5-1
(1) Turn main power source OFF
(2) Turn selector & left / right roller levers ON. Raise bank lifter.
(3) Loosen and remove bank up cylinder rod & lifter cylinder shaft.
(Dia. 9 - 5 - 2) On side to be replaced
1-95
Left PA500750200
Right PA500750100
Bank up detec Bank up
cylinder tor cable
Bank up detector cable
Bank up cylinder mounting
screw
E2756721000
Lifter cylinder shaft
Drive cylinder ass
y
mounting screw
Bank lifte
r
Only attach bank up detector cable on the left.
Lengths differ:
Front is E95577250AO
Rear is E95577250AO
Fig. 9-5-2
1-96
(4) Shut off main air supply (hand valve).
(5) Remove screws holding drive cylinder assy on left and right sides.
(6) Raise bank lifter to remove (on replacement side).
(7) Remove the 4 screws holding bank up cylinder and remove cylinder.
(8) Switch connection of speed controller & bank up detector cable (left only) to the new cylinder.
Provisionally connect cable 10mm from top.
(9) Mount cylinder and insert bank lifter from above.
(10) Screw lifter cylinder shaft into cylinder rod.
(11) Open main air supply.
(12) Adjust speed control for left / right cylinders. (Refer to section9 - 6.)
(13) Mount drive cylinder assy.
1-97