00197004-04_UM_X-Serie-S_EN.pdf - 第234页
4 Setting up and commissioning User manual SIPLACE X-Series 4.2 Infrastructure at the installation location From software ve rsion 706.1 SP1 Version 10/2014 234 4.2.3.2 Checking the main power supply Check whether the p …

User manual SIPLACE X-Series 4 Setting up and commissioning
From software version 706.1 SP1 Version 10/2014 4.2 Infrastructure at the installation location
233
4.2.3 Main power supply
4
Fig. 4.2 - 2 Position of power supply on the machine (example of SIPLACE X2 S / X3 S / X4 S shown)
(1) Lock
(2) Main power switch secured to prevent switching on again
(3) Power supply unit (behind the cover)
(4) Mains connection cable
4.2.3.1 Danger notes
4
(1)
(2)
(3)
(4)
DANGER
Dangerous voltage levels!
The machine is supplied with 3 x 200 V~, 3 x 208 V~, 3 x 220 V~, 3 x 230 V~,
3 x 380 V~, 3 x 400 V~ or 3 x 415 V~ ± 5 %, 50/60 Hz mains voltage. This means that
some parts of the system carry potentially lethal voltages - even when switched off at the
main power switch.
Incorrect handling of this machine can therefore result in death or severe injury or con-
siderable damage to equipment.
Always follow the applicable accident prevention and DIN regulations (particularly
EN 60204, part 1 or IEC 60204, part 1) and the applicable regulations in your own
country.
The covers over the power supply unit may ONLY be opened by appropriately qual-
ified and trained personnel.

4 Setting up and commissioning User manual SIPLACE X-Series
4.2 Infrastructure at the installation location From software version 706.1 SP1 Version 10/2014
234
4.2.3.2 Checking the main power supply
Check whether the power supply complies with the prescribed machine specifications (see table
in section 3.2
, page 121).
4
4.2.3.3 Power supply cable - specification
The following specifications apply at the customer end to the power supply for the machine:
– 5 x 2.5 mm² at 3 x 380 V~ / 3 x 400 V~ / 3 x 415 V~ at cable lengths of up to 20 meters be-
tween placement machine distribution and mains connection at the customer end. Over 20
meters cable 5 x 4 mm².
– 5 x 4 mm² at 3 x 200 V~/ 3 x 208 V~ / 3 x 220 V~ / 3 x 230 V~ at cable lengths of up to 20
meters between placement machine distribution and mains connection at the customer end.
Over 20 meters cable 5 x 6 mm².
The color coding for the wires will depend on the country in which the system is operated.
4
PLEASE NOTE
Load peaks in power supply
For technical reasons, load peaks occur in the power supply.
Please contact your power company to clarify the mains impedance, if necessary.
WARNING
Clear marking of electrical leads!
The electrical leads to each individual machine and to the options installed must be clear-
ly labeled and easily assignable.
The regulations of the country in which the machine is operated apply.

User manual SIPLACE X-Series 4 Setting up and commissioning
From software version 706.1 SP1 Version 10/2014 4.2 Infrastructure at the installation location
235
4.2.3.4 Mains connection - delivery configuration
The main power connection is configured according to the power supply of the country concerned.
– The machine is configured for voltages of 200V AC, 220V AC or 230V AC.
The machine has a mains power cable WITHOUT plug. 4
4
Fig. 4.2 - 3 Description of wires in the mains power cable
– The machine is configured for voltages of 380V AC, 400V AC or 415V AC.
The machine has a mains power cable WITH Cekon plug. 4
4
Fig. 4.2 - 4 Assignment in the Cekon plug
1 = (L1): three-phase
2 = (L2): three-phase
3 = (L3): three-phase
4 = (N): neutral conductor
green/yellow = (PE): conductor
PE
L1
L2
L3
N