Infinity EX Transportation.pdf - 第39页
INFINITY EX TRANS PORTATION MAJOR RELO CATION Chapter Issue 3 J an 04 Technical Reference Manual 31.39 • M27PL06 - Auxiliary con veyor front transport belt motor 7. Connect the electrical connector labelled M27SOL02 to t…

INFINITY
EX
TRANSPORTATION
MAJOR RELOCATION
31.38 Technical Reference Manual Chapter Issue 3 Jan 04
l. Tighten bolt C loosened in Step 4j and repeat the check.
5. Connect M27PL07 to the rear transport belt motor socket fitted to the rear
face of the rear auxiliary conveyor rail.
6. Connect to following connectors situated on the front auxiliary conveyor rail:
• M27SK05 - Auxiliary conveyor sensor
Rear View of Left Hand Auxiliary Conveyor
Bolt C on Outer Face
Of Conveyor Frame Uprights
Rear Upright of
Conveyor Frame
Front Upright of
Conveyor Frame
Height Adjustment
Grub Screw
Height Adjustment
Grub Screw
Connector M27PL07
Rear View on Left Hand Auxiliary Conveyor

INFINITY
EX
TRANSPORTATION
MAJOR RELOCATION
Chapter Issue 3 Jan 04 Technical Reference Manual 31.39
• M27PL06 - Auxiliary conveyor front transport belt motor
7. Connect the electrical connector labelled M27SOL02 to the solenoid valve
M27SOL02 fitted to the rear face of the front upright of the conveyor frame.
8. Connect the 4mm pneumatic pipe to M27SOL02 solenoid valve.
9. Refit the left hand machine side panels removed in Step 1.
To fit the right hand auxiliary conveyor carry out the following procedure:
10.Remove the right hand machine side covers.
11.Whilst fully supporting the right hand auxiliary conveyor, attach the con-
veyor to the machine lower frame attachment points using eight M5 bolts.
DO NOT fully tighten the bolts at this stage.
12.Carry out the following procedure to check the gap between the right hand
auxiliary conveyor rails and the print station rails:
a. Disconnect the two 4mm pneumatic pipe connections to the conveyor
board stop.
b. Loosen and remove the two M5 cap head screws securing the board stop
bracket to the conveyor and remove the bracket and board stop.
c. Using feeler gauges or a 3mm allen key, ensure that the gap between the
print station and the right hand auxiliary conveyor (in two positions) is 3.0
± 0.5mm.
Connector M27SK05
Connector M27PL06
Front View on Left Hand Auxiliary Conveyor
Board Clamp
Board Transport Rail
Auxiliary Conveyor
Print Station
Plan View on Print Station and Auxiliary Rails
5157438
3.0mm +/- 0.5mm

INFINITY
EX
TRANSPORTATION
MAJOR RELOCATION
31.40 Technical Reference Manual Chapter Issue 3 Jan 04
d. If adjustment is required, carefully adjust the position of the conveyor to
obtain the 3.0±0.5mm gap.
e. Tighten the M5 securing bolts fitted in Step 11.
f. Refit the board stop and bracket to the auxiliary conveyor using the two
M5 caphead screws removed in Step 3b. DO NOT fully tighten the
screws.
g. Using a feeler gauges check the gap between the auxiliary conveyor rail
and the inner face of board stop is a maximum of 0.1mm . Adjust the gap
as necessary by repositioning the board stop bracket.
h. Tighten the screws fitted 3f and recheck the gap.
13.Carry out the following procedure to check and if required adjust the right
hand auxiliary conveyor levelling:
Rear View of Right Auxiliary Conveyor
Front Auxiliary Conveyor
Rail Support
Rear Auxiliary Conveyor
Rail Support
Rail Support to Main Frame
Bolts (4 bolts in 2 positions)