00197088-03_AI_Barcode_SICK620_SX12_X-S_TX_DE_EN.pdf - 第99页
3 Installation 3.8 Running and Connecting the Cable Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2 Option PCB Barcode / LP-Barcode (Lector 620) 05/2019 99 Fig.45: Routing the power su…

3 Installation
3.8 Running and Connecting the Cable
98 Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2
Option PCB Barcode / LP-Barcode (Lector 620) 05/2019
Cable routing
Assembly kits:
●
Electric mounting 2D PCB Barcode X-Series S SC [03104886-xx]
●
A dual conveyor requires "Electric mounting 2D Barcode X-Series S DC[00166666‑xx]" in ad-
dition
Fig.41: Switch cabling
Fig.42: Cable routing, on left
Fig.43: Cable routing, at top
NOTICE!
LAN cable
The LAN cable is only mandatory for
the configuration of the PCB barcode
scanner. For the operation and func-
tions of the PCB barcode scanners the
LAN cable is not absolutely necessary.
.
► Connect the LAN cable to the switch (1).
► Connect the power supply cable
(DC5V) [03104923‑xx] to the switch
and to the cable [03104892‑xx].
The cable [03104892‑xx] is among the
cables for the upper PCB barcode
reader.
► Make sure that the cables have enough
play. In contrast to the top PCB bar-
code readers, the cables for the bottom
PCB barcode readers are not run
through a trailing chain.
► Use the Klettostar fastener to fasten
the switch to the bottom of the input
conveyor extension.
► In case of unnecessary cable length,
place the cables at the bottom of the in-
put conveyor extension.
Fig.44: Cable routing, on right

3 Installation
3.8 Running and Connecting the Cable
Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2
Option PCB Barcode / LP-Barcode (Lector 620) 05/2019
99
Fig.45: Routing the power supply cable
► Run the power supply cable through
the recess(1) to the conveyor con-
trol(2).
Fig.46: Conveyor control
1. Connectors for PCB barcode scanners
– Lane 1 / Single Conveyor:
PCB Barcode Scanner b 1 Lane
Bottom X81+83
PCB Barcode Scanner b 2 Lane
Top X82+84
– Lane 2 (Dual Conveyor only)
PCB Barcode Scanner b3 Lane Bot-
tom X81+83
PCB Barcode Scanner b4 Lane Top
X82+84
See also:
–
5.3.3 "Conveyor control TSP420
[03087642-xx]" [}125]
– 5.1 "Circuit Diagrams" [}113]
► Connect the cables to the connectors
X81 to X84(1).
► Repeat these steps for the second con-
veyor lane if required.

3 Installation
3.8 Running and Connecting the Cable
100 Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2
Option PCB Barcode / LP-Barcode (Lector 620) 05/2019
Fig.47: LAN cable routing
► Run the LAN cable(1) from the switch through the recess(2) at the conveyor control, through
the pedestal(3), and through the cable duct(4) to the BoxPC(5).
Fig.48: BoxPC ABP402-A
► Connect the LAN cable to the new LAN
card in the BoxPC(1) (see also 3.7 "In-
stalling the LAN card in the
BoxPC" [}97]).
Fig.49: Connections BoxPC ABP402-A CPU1020E 2xPCI SSD (iBase) [03120423-xx] (from Nxxxx onwards)