00197088-03_AI_Barcode_SICK620_SX12_X-S_TX_DE_EN.pdf - 第99页

3 Installation 3.8 Running and Connecting the Cable Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2 Option PCB Barcode / LP-Barcode (Lector 620) 05/2019 99 Fig.45: Routing the power su…

100%1 / 130
3 Installation
3.8 Running and Connecting the Cable
98 Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2
Option PCB Barcode / LP-Barcode (Lector 620) 05/2019
Cable routing
Assembly kits:
Electric mounting 2D PCB Barcode X-Series S SC [03104886-xx]
A dual conveyor requires "Electric mounting 2D Barcode X-Series S DC[00166666‑xx]" in ad-
dition
Fig.41: Switch cabling
Fig.42: Cable routing, on left
Fig.43: Cable routing, at top
 NOTICE!
LAN cable
The LAN cable is only mandatory for
the configuration of the PCB barcode
scanner. For the operation and func-
tions of the PCB barcode scanners the
LAN cable is not absolutely necessary.
.
Connect the LAN cable to the switch (1).
Connect the power supply cable
(DC5V) [03104923‑xx] to the switch
and to the cable [03104892‑xx].
The cable [03104892‑xx] is among the
cables for the upper PCB barcode
reader.
Make sure that the cables have enough
play. In contrast to the top PCB bar-
code readers, the cables for the bottom
PCB barcode readers are not run
through a trailing chain.
Use the Klettostar fastener to fasten
the switch to the bottom of the input
conveyor extension.
In case of unnecessary cable length,
place the cables at the bottom of the in-
put conveyor extension.
Fig.44: Cable routing, on right
3 Installation
3.8 Running and Connecting the Cable
Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2
Option PCB Barcode / LP-Barcode (Lector 620) 05/2019
99
Fig.45: Routing the power supply cable
Run the power supply cable through
the recess(1) to the conveyor con-
trol(2).
Fig.46: Conveyor control
1. Connectors for PCB barcode scanners
Lane 1 / Single Conveyor:
PCB Barcode Scanner b 1 Lane
Bottom X81+83
PCB Barcode Scanner b 2 Lane
Top X82+84
Lane 2 (Dual Conveyor only)
PCB Barcode Scanner b3 Lane Bot-
tom X81+83
PCB Barcode Scanner b4 Lane Top
X82+84
See also:
5.3.3 "Conveyor control TSP420
[03087642-xx]" [}125]
5.1 "Circuit Diagrams" [}113]
Connect the cables to the connectors
X81 to X84(1).
Repeat these steps for the second con-
veyor lane if required.
3 Installation
3.8 Running and Connecting the Cable
100 Assembly Instructions / Montageanleitung SIPLACE TX-Series, X-Series S, SX1/SX2 V2
Option PCB Barcode / LP-Barcode (Lector 620) 05/2019
Fig.47: LAN cable routing
Run the LAN cable(1) from the switch through the recess(2) at the conveyor control, through
the pedestal(3), and through the cable duct(4) to the BoxPC(5).
Fig.48: BoxPC ABP402-A
Connect the LAN cable to the new LAN
card in the BoxPC(1) (see also 3.7 "In-
stalling the LAN card in the
BoxPC" [}97]).
Fig.49: Connections BoxPC ABP402-A CPU1020E 2xPCI SSD (iBase) [03120423-xx] (from Nxxxx onwards)