00194845-0302_MM_D1_D2_EN.pdf - 第45页
SIPLA CE D1 / D2 7 4-monthly maintenance jobs 02/2010 EN Edition 45 7 For the 4- monthly preventiv e maintena nce of the 6 / 12 C&P h eads you will nee d: 7 – Pli ers f or fi ttin g the K hose 2MS-PK-3 /4 – Short-bri…

7 4-monthly maintenance jobs SIPLACE D1 / D2
02/2010 EN Edition
44
7 4-monthly maintenance jobs
7.1 Maintenance of the C&P 6 / 12 placement heads
Structure of the 12-segment Collect&Place head 7
7
Fig. 7.1 - 1 12-segment Collect&Place head, digital
(1) Vacuum generator
(2) Turning station, DP axis
(3) Star with 12 sleeves, DR axis
(4) Forced air valve
(5) Silencer
s
a
g
f
d

SIPLACE D1 / D2 7 4-monthly maintenance jobs
02/2010 EN Edition
45
7
For the 4-monthly preventive maintenance of the 6 / 12 C&P heads you will need: 7
– Pliers for fitting the K hose 2MS-PK-3/4
– Short-bristled brush
– Set of hexagon socket spanners
– Lint-free cloths
– Lint-free cottonwool buds
– Ethyl alcohol
– ISOFLEX TOPAS NCA52
– UNISILKON L250L
– Oil dispenser with Structovis GHD (replaces MULTEMP PS no. 2 grease gun)
– Set of cleaned sleeves (new sleeves, if required)
– Set of cleaned valve plungers (new valve plungers, if required)
– New Z axis toothed belt, if required
– New vacuum distributor, if required
– New O-ring, turning station, if required
– New toothed belt for the turning station, if required.
7
7
Preparatory work 7
: Set down the nozzles of all the Collect&Place heads in the nozzle changer.
: Switch the placement machine off at the main switch.
7
: Remove the head cover.
7
7
7

7 4-monthly maintenance jobs SIPLACE D1 / D2
02/2010 EN Edition
46