00194845-0302_MM_D1_D2_EN.pdf - 第63页
SIPLA CE D1 / D2 8 Annual maintenance work 02/2010 EN Edition 63 8 Y ou will n eed the foll owing tool s, equip ment and cons umables for the an nual mainten ance: 8 – V a cuum cleane r – Greas e gun – SIPLA CE cleanin g…

8 Annual maintenance work SIPLACE D1 / D2
02/2010 EN Edition
62
8 Annual maintenance work
8

SIPLACE D1 / D2 8 Annual maintenance work
02/2010 EN Edition
63
8
You will need the following tools, equipment and consumables for the annual maintenance: 8
– Vacuum cleaner
– Grease gun
– SIPLACE cleaning tissue
– ISOFLEX TOPAS NCA52 grease
– Grease nipples, if required
– Damping cylinder, if required.
8
There must be no PCB on the PCB conveyor during the following activities. 8
: Open the protective cover on one side of the machine.
8
Move the gantry carefully by pushing gently, holding with the handle on the head (not on the end
buffers). 8
8
: Move the gantry over the feeder modules. This will stop it outside your working area.
8
Clean and preserve the PCB conveyor 8
a Clean and preserve the recirculating ball screw by running a SIPLACE cleaning tissue along
the thread of the screw.
s Clean and grease the sliding surfaces of the guide rails using a SIPLACE cleaning tissue.
: Clean and preserve the hexagonal shafts using a SIPLACE cleaning tissue.
: Check that the complete mechanism of the PCB conveyor (conveyor, width adjustment, clamp-
ing unit) moves easily.
If any part is stiff, carry out the appropriate maintenance.
8
Clean the fixing strip (PCB conveyor) 8
d Clean the fixing belt of the width adjustment clamp using a lint-free cloth moistened with ethyl
alcohol.
8
8

8 Annual maintenance work SIPLACE D1 / D2
02/2010 EN Edition
64
8