00194845-0302_MM_D1_D2_EN.pdf - 第47页
SIPLA CE D1 / D2 7 4-monthly maintenance jobs 02/2010 EN Edition 47 Remember to f ollow the ES D regula tions. 7 7 7 : Cover the fe eder area to protect the feeder mo dules and fr ont part of the hea d. 7 a Open the stra…

7 4-monthly maintenance jobs SIPLACE D1 / D2
02/2010 EN Edition
46

SIPLACE D1 / D2 7 4-monthly maintenance jobs
02/2010 EN Edition
47
Remember to follow the ESD regulations.
7
7
7
: Cover the feeder area to protect the feeder modules and front part of the head.
7
a Open the strain relief.
s Open the retainer over the ribbon cables.
d Pull out the two ribbon cables.
7
f Loosen the 4 screws on the front part of head (using the 3 mm socket-head spanner) and re-
move the front part.
Hold the front part of head firmly as you remove the screws. 7
Watch out for the vacuum distributor. 7
7
Turn the star half a revolution to avoid damaging the valve plunger drive with the valve plunger.7
7
: Place the front part of head on a soft ESD surface (with the valve plunger side underneath) or
place it on a suitable head stand.
: Remove the sleeves and place them in the containers provided.
7

7 4-monthly maintenance jobs SIPLACE D1 / D2
02/2010 EN Edition
48
7