00196749-02_UM_LDU-X_EN.pdf - 第5页
5 Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017 Contents 8 Process Technology .. 81 8.1 Using Flux .. 81 8.2 Dipping Process in the Placement Machine .. 82 8.3 Travel profile .. 83 8.4 Layer thicknes…

4 Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017
Contents
4.4 Error Messages.. 45
4.4.1 Overview of Error Messages.. 45
4.4.2 Messages About the Level Sensor.. 46
4.4.3 Messages About the Refill Unit.. 46
4.4.4 Messages About Monitoring Coating Intervals.. 46
4.4.5 Messages About the Cleaning Cycle.. 46
4.4.6 Messages About the Dip Plate and Dip Tray.. 46
4.4.7 Messages About the Key Switch.. 47
4.4.8 Messages About the Emergency Stop.. 47
5 Working with the LDU‑X.. 49
5.1 Removing the transportation fastenings.. 49
5.2 Configuring the LDU‑X.. 49
5.2.1 SIPLACE PRO.. 49
5.2.2 Handling.. 51
5.2.3 Configuring the LDU-X.. 51
5.2.4 Removing the LDU‑X.. 52
5.2.5 Setting up the LDU-X.. 52
5.2.5.1 Performing Height Measurement.. 53
5.2.5.2 Aligning the dip plate.. 54
5.3 Monitoring production.. 57
6 Maintenance.. 59
6.1 Greasing spindles and guides.. 59
6.2 Cleaning.. 59
6.2.1 Removing the Parts to be Cleaned.. 61
6.2.2 Cleaning the dip components.. 61
6.2.3 Refit the cleaned parts.. 62
7 Options.. 63
7.1 Level sensor.. 63
7.1.1 Retrofitting the level sensor.. 63
7.1.1.1 Opening the LDU-X.. 63
7.1.1.2 Installing the level sensor.. 65
7.1.1.3 Checking the Light Conductor.. 67
7.1.1.4 Adjusting the control unit.. 68
7.1.1.5 Closing the LDU-X.. 68
7.1.1.6 Initializing the LDU-X (storing sensor position).. 69
7.1.1.7 Function Test.. 69
7.1.2 Activating and deactivating the level sensor.. 70
7.1.3 Function.. 70
7.1.4 Cleaning the Level Sensor.. 71
7.2 Refill Unit.. 71
7.2.1 Retrofitting the refill unit.. 71
7.2.1.1 Opening the LDU-X.. 72
7.2.1.2 Installing the refill unit.. 73
7.2.1.3 Closing the LDU-X.. 79
7.2.1.4 Function Test.. 80
7.2.2 Activating and deactivating the refill unit.. 80

5Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017
Contents
8 Process Technology.. 81
8.1 Using Flux.. 81
8.2 Dipping Process in the Placement Machine.. 82
8.3 Travel profile.. 83
8.4 Layer thickness.. 83
8.5 Parameters for the application process.. 86
8.6 Dipping procedure for TwinHead.. 87
8.7 Dipping Procedure for C&P Head.. 90
8.8 Dipping Parameters in SIPLACE Pro.. 93
8.9 Vacuum checks.. 93
8.10 Pressing Down Dipped Components.. 93
8.11 Cicatrization time.. 94
8.12 Thixotropy and viscosity.. 95
8.13 Checking the layer thickness.. 95
8.13.1 Flux Layer Height Measuring Device "Comb".. 95
8.13.2 Flux Layer Height Measuring Device "Reel".. 96
8.14 Testing New Flux Types.. 97

6 Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017
Contents