8 Process Technology 8.7 Dipping Procedure for C&P Head 92 Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017 (4) Segment 1 dips the first component into the cavity of the LDU-X.The head then moves the seg- m…

100%1 / 100
8 Process Technology
8.7 Dipping Procedure for C&P Head
Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017 91
Procedure (example)
1. The placement head moves over the feeder.
2. The placement head picks the component(s) up
from the feeder e.g. 12 components in succes-
sion.
3. The placement head moves with the components
to the LDU-X.
4. The placement head dips the 12 components in
succession, into the flux.
5. The placement head moves the dipped compon-
ents to the board.
6. The placement head then places the 12 compon-
ents on the board.
Detailed procedure for C&P head
(1) All head segments are empty. Segment 1 picks up a component from a tray or feeder. Segment
5 is rotated into the pickup angle by the turning station.
The head then moves the segments on and picks up the next components in succession.
(2) Segment 9 has just picked up a component. Segments 1, 2 and 3 were under the component
camera. However, the camera is not active and the components were not measured. Segment 1 is
in the turning station. However, the turning station is not active and all components are still in the
pickup angle.
(3) The head has picked up 12 components.The gantry now moves from the feeder to the LDU-X.
8 Process Technology
8.7 Dipping Procedure for C&P Head
92 Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017
(4) Segment 1 dips the first component into the cavity of the LDU-X.The head then moves the seg-
ments on and dips the next components into the cavity, in succession.
(5) Segment 1 is now under the component camera which is measuring the first component.
(6) Segment 1 is now in the turning station.The turning station rotates the component into the
placement angle.
(7) Segment 12 has just dipped the last component into the LDU-X cavity. The gantry now moves
from the LDU-X to the board in the board conveyor.
(8) Segment 1 places the first component. At the same time, segment 7 is measured by the camera
and segment 5 is rotated into the placement angle. The head then moves the segments on and
places the next components in succession.
(9) The turning station rotates the empty segments back into the pickup angle.
8 Process Technology
8.8 Dipping Parameters in SIPLACE Pro
Operating Manual SIPLACE LDU-X Linear Dipping Unit 11/2017 93
8.8 Dipping Parameters in SIPLACE Pro
The two procedures Dipping-Vision and Vision–Dipping plus the dwell time can be selected in
SIPLACE Pro. The parameters for the dipping process can be set in the Component Shape Editor,
at Handling (1) in the Dip (2) section.
Selection list Mode:
●
No dipping
●
Dipping/Vision
●
Vision/Dipping
Entry field Dwell time [ms]: the dwell time in milliseconds can be set here.
Checkbox Inspect flux after dipping: this option enables an additional control function. The
component is moved past the component camera again after dipping. This checks whether the
component was displaced during dipping.
8.9 Vacuum checks
During the placement process, the vacuum checks test whether the component is on the nozzle or
whether it might have been lost in the flux.
●
Vacuum check before dipping
●
Vacuum check after dipping
If the component was lost, it will be placed again.
8.10 Pressing Down Dipped Components
It might be useful to hold the components on the board or to press them against the board for a
short moment during placement.
For this purpose, go to the submenu Handling(1) in the Component Shape Editor , where you can
set a Waiting time(2) in milliseconds (typically: 100ms):