iTAC Advance Issue 2, Mar 2018.pdf - 第20页

20 Issue 2 , Mar 18 Multilevel BOM BOM can contain semi-finished product (marked as product). Multilevel BOMs are displayed on the left window of BOM module. Note: If new version of Multilev el BOM is rele ased, then it …

100%1 / 77
19
Issue 2, Mar 18
❑ Select appropriate dates for Valid from/to fields. Repeat same in proces version tab. Confirm
by OK.
New version should be valid on main page.
NOTES:
20
Issue 2, Mar 18
Multilevel BOM
BOM can contain semi-finished product (marked as product).
Multilevel BOMs are displayed on the left window of BOM module.
Note: If new version of Multilevel BOM is released, then it has to be updated in BOM editor
(left window)
NOTES:
21
Issue 2, Mar 18
Work Plan (WP)
Contains all work steps necessary for manufacturing of specific product. Existing equipment
can be assigned into required work step (e.g. paste printer) of selected Work plan version.
❑ Go to ADM\Master Data\Work plan Data\Work Plan
To open specific WP select specific WP then click on work steps tab or right click, then select show.
Only valid WP is displayed by default, to see all WP remove tick from “Valid work plans only” and
then search again.
For those steps where iTAC in use, make sure feedback required is ticked.