50 Issue 2 , Mar 18 Simplified hierarchy among modules necessary for production MDA – Recipe . The recipe contains product names for Top/Bottom side + MES Key sw itch which is assigned to specific BOM. Bill of Material –…

100%1 / 77
49
Issue 2, Mar 18
NOTES:
50
Issue 2, Mar 18
Simplified hierarchy among modules necessary for production
MDA – Recipe. The recipe contains product names for Top/Bottom side + MES Key switch which is
assigned to specific BOM.
Bill of Material – This module contains list of all products. Each product consist list of material - all
parts. Each product can have more BOM versions.
Equipment – All existing equipment such as stencil/squeegees are stored in ADM\Master
Data\Equipment
Work Plan – Contains all work steps necessary for manufacturing of specific product. Existing
equipment can be assigned into required work step (e.g. paste printer) of selected Work plan version
Work Order – Defines production order according to current demand. Work order consists required
quantity, Product part number + BOM version and exact work plan version.
Work order is to be activated on the line in order to start production.
NOTES:
Objective HO 10: Create new version of BOM
Objective HO 11: Create new equipment
Objective HO 12: Create new version of WP and assign new equipment
Objective HO 13: Create new WO
Objective HO 14: Create new version of recipe
51
Issue 2, Mar 18
API Module (Application Programming Interface)
API module is basically the list of various functions (calls) which are used as communication
interface between machine (e.g. printer, placement machine, etc.) and other software.
Structure - Process layers:
0 - Component Side (DIE COMPONENSEITE)
1 - Solder Side (DIE LOTSEITE)
2 - Pos. Independent (LAGER UNABHÄNGIG)
Possible status of PCB booking:
0 - Pass (GUT)
1 - Fail (NACHARBEIT)
2 - Scrap (AUSSCHUS)