74 Issue 2 , Mar 18 31 Open cover and scan re quired equipment equipment verif ication should not b e possible due to dif ferent equipm ent description 32 Kill DEK software. Edit values in "ItacVerificationItem s.xm…

73
Issue 2, Mar 18
15
Open cover, un-verify rear
squeegee. In Setup
Product\Option\Verification disable
Squeegee Blade Rear. Scan
(PASS) PCB on upline conveyor.
PCB should be rejected by machine
due to un-rigged rear squeegee on
the iTAC
16
Enable Squeegee Blade Rear in
Verification page and rescan.
Scan (PASS) PCB on upline
conveyor.
PCB should be accepted by
machine
17
Use mlChangeMaterialBinData
and change quantity to 1 on used
paste container.
2nd PCB should be rejected by
machine due to 0 quantity
18
Scan new paste container with
expired date.
Material should remain unverified -
red cross
19
check in iTAC if paste container is
rigged
Paste container should not be
rigged
20
In iTAC extend expiry date for
current paste container and rescan
material should be verified - green
tick
21
re-check in iTAC if paste container
is rigged
Paste container should be rigged
22
Load another product on printer
all equipment and material should
be unverified (red cross)
23
Check iTAC server on TR \ MIS -
Work order \ Order for the Paste
Printer line
all material and equipment should
be deleted from the line and
unrigged from WO
24
Open cover and scan required
equipment & material
All equipment and material should
be verified (green tick)
25
Check iTAC server on TR \ MIS -
Work order \ Order for the Paste
Printer line
scanned material should be setup
on the line and scanned equipment
rigged on the WO
26
Scan (PASS) PCB on upline
conveyor
PCB should be rejected by machine
due to different product name in
recipe
27
Open cover and scan all
equipment & material.Disable
iTAC Product Verification in iTAC
plugin. Scan (PASS) PCB on
upline conveyor
PCB should be accepted by
machine
28
Enable iTAC Product Verification
in iTAC plugin. Load correct
product on Printer. Re-scan
required equipment & material.
Scan (PASS) PCB on upline
conveyor
PCB should be accepted by
machine
29
Activate another recipe (with
different product name) for current
product. Scan (PASS) PCB on
upline conveyor
PCB should be rejected by machine
due to different product name in
recipe
30
Activate original recipe. Create
new Work plan for current product
and assign new equipment with
different equipment description.
Create new WO and assign new
work plan. Activate new WO on
line
No reaction on the printer

74
Issue 2, Mar 18
31
Open cover and scan required
equipment
equipment verification should not be
possible due to different equipment
description
32
Kill DEK software. Edit values in
"ItacVerificationItems.xml" file
according to equipment
description of new equipment used
on activated WO. Start DEK
software, initialize machine, open
cover and scan required
equipment and material.
All equipment and material should
be verified (green tick)
33
Check iTAC server on TR \ MIS -
Work order \ Order
scanned material should be setup
on the line and scanned equipment
rigged on the WO
34
Activate setup of current WO
WO should be activated
35
Scan (PASS) PCB on upline
conveyor
PCB should be accepted by
machine
36
Set incorrect 1st character and
number of characters for print
medium in Maintenance\Machine
Setup\Barcodes. Open cover and
scan material
material verification should not be
possible due to wrong barcode
37
Disable print medium in Setup
Product\Option\Verification
no reaction on the printer
38
Activate recipe on iTAC with MES
key set to "OFF"
no reaction on the printer
39
Place PCB with no barcode on
upline conveyor
PCB should be accepted by
machine due to MES OFF in recipe
40
Activate previous recipe on iTAC
with MES key se to "ON"
no reaction on the printer
41
Change material barcode setting
back to original. Enable print
medium in Setup
Product\Option\Verification. Open
cover and scan material
All equipment and material should
be verified (green tick)
42
Scan (PASS) PCB on upline
conveyor
PCB should be accepted by
machine
43
Deactivate WO from iTAC, Scan
(PASS) PCB on upline conveyor
PCB should be rejected by machine
NOTES:

75
Issue 2, Mar 18
Glossary
ADM
ADMinistration module - The ADM Module is used to maintain
all master data such as machines/components/work
plans/equipment, etc.
API
Application Programming Interface module - API module is
basically the list of various functions (calls) which are used as
communication interface between machine (e.g. printer,
placement machine, etc.) and other software.
Assigned Serial
numbers
Are the barcodes for specific PCBs/panels assigned to the
specific work step - station. It can be found in TR\MIS - Work
orders\Order. Double click on blue icon of Order no. for
specific station, e.g. printer. Click on serial no. tab.
BOM
Bill Of Material module - is used for creating & editing of
BOMs.
Component side
Older terminology used by iTAC for PCB layer (usually Top
side/ 2
nd
side).
Container number
Regarding paste printer it is the barcode on each individual
paste pot/cartridge/cassette, etc. It should contain unique
number.
Equipment
Equipment is each specific consumable which is necessary
for manufacturing of selected product on particular station (on
printer it is e.g. screen, squeegee, tooling, etc.).
ERP
Enterprise resource planning
Fail
Is the status of the PCB or panel inside of PCB (multipanel
PCB). The production failed, but panel can be repaired.
Material
Material is each physical part included in BOM. This means
final product contains this part which is used during
manufacturing process (on the printer it is only print material).
MDA
Manufacturing Data Administration module - We use this
module for administration of recipes only.
MES
Manufacturing Execution System
MES Switch
Is the recipe characteristic which determines whether the
MES is used or not. By default the MEASURE_NAME=MES
and NOMINAL=OFF
ML
Material & Logistic module - maps material flow and logistics
for production lines – from receiving to finished goods
inventory. For DEK only print material is maintained in this
module. In this module can be found if the paste is rigged or
not.
Pass
Is the status of the PCB or panel inside of PCB (multipanel
PCB). The production passed and can be processed by next
work step
PCB
Printed Circuit Board
Recipe
The recipe is important for product name check – contains
program name for Top & Bottom side. Also contains MES
switch. MES switch determines whether station is using MES
or not.
Rigged material or
equipment
Material or equipment was verified and accepted by iTAC. If
any used material or equipment is not rigged the production
cannot start.